Skip to main content

GNWT-INF - MV2024L8-0004

​GNWT Department of Infrastructure is planning the design and replacement of the Jean Marie River Bridge. The Project involves the replacement of the existing Jean Marie River Bridge with a new single span bridge. Activities involved in replacing the existing bridge includes construction of a temporary detour bridge, demolition, disposal and reclamation of the existing bridge, and construction of the new single span bridge.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
6. Management Plans
Sediment and Erosion Control
Document Received/Sent Uploaded
GNWT-INF - Jean Marie River Bridge - Sediment and Erosion Control Plan V1.1 - Oct4_24.pdf (15.69 MB)