Skip to main content

GNWT-INF - MV2024L8-0004

​GNWT Department of Infrastructure is planning the design and replacement of the Jean Marie River Bridge. The Project involves the replacement of the existing Jean Marie River Bridge with a new single span bridge. Activities involved in replacing the existing bridge includes construction of a temporary detour bridge, demolition, disposal and reclamation of the existing bridge, and construction of the new single span bridge.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
GNWT-INF - Jean Marie River Bridge - Standard Design Drawings - Feb4_25.pdf (6.03 MB)
GNWT-INF - Jean Marie River Bridge - Design Drawings List and Site Map - Jan27_25.pdf (5.09 MB)
GNWT-INF - Jean Marie River Bridge - General Design Drawings - Jan27_25.pdf (25.65 MB)
GNWT-INF - Jean Marie River Bridge - Structural Design Drawings - Jan27_25.pdf (16.36 MB)