Skip to main content

GNWT-INF - MV2024E0001

​Continuous and ongoing operation and maintenance of the existing NWT Public Highway system along NWT Highway 6 between KM 0 and KM 90, including the Community Access Road (Nagel Channel Road) and other minor roads along the Fort Resolution Highway - Great Slave Lake Route.


Previous Permit: MV2017X0007

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
GNWT-INF - HWY 6 - Inspection Report - July 11, 2024 - Nov7_24.pdf (2.6 MB)
GNWT-INF - HWY 6 - Inspection Reports - May28_24.pdf (2.65 MB)