Skip to main content

GNWT-INF - MV2023L8-0014

​The Government of the Northwest Territories, Department of Infrastructure (GNWT-INF) placing approximately 2525 m3 of fill within the highwater mark between Km 59.2 to 60.9 on NWT Highway 4 (Ingraham Trail). The fill will be sourced from the quarry at Km 55.3 on NWT Highway 4.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
GNWT-INF - Inspection Report - October 21, 2024 - Mar 5_25.pdf (1.1 MB)