Skip to main content

GNWT-INF - MV2023E0012

​The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within the area along the Mackenzie Highway between kilometre 278 and kilometre 800 which includes community access roads for Fort Simpson, Jean Marie River, Trout Lake, Willow Lake River Settlement,
Wrigley as listed under the Highways Act, and Includes highway and airport Infrastructure: (I.e. roadway embankment,bridge, and culvert maintenance and replacement, winter road and Ice bridge construction and maintenance, airstrip surfacing and Ferry Services and Operations).

Rewnewal of MV2016E0006

Uploaded On or After
Uploaded On or Before
Displaying 1 - 28 of 28
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
GNWT-INF - Issuance - Type A Land Use Permit - May31_23.pdf (964.75 KB)
External Authorizations
Document Received/Sent Uploaded
GNWT-INF - Quarry Permit from GNWT - May13_24.pdf (346.47 KB)
GNWT-INF - Quarry Permit from GNWT - 2024QP0013 - May13_24.pdf (346.48 KB)
GNWT-INF - Quarry Permit from GNWT - Limestone - 2024QP0012 - May13_24.pdf (346.3 KB)
GNWT-INF - 2023QP0017 - Letter - Dec7_23.pdf (34.09 KB)
GNWT-INF - 2023QP0017 - Permit - Dec7_23.pdf (62.39 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNWT-INF - HR Harbour - Reviewer Comments and Proponent Responses - Jun1_23.pdf (106.8 KB)
GNWT-INF - Letter of Acceptance from Waste Facility - Apr18_23.msg (97 KB)
GNWT-INF - Draft Conditions - Apr14_23.pdf (345.73 KB)
GNWT-INF - Engagement Plan and Log - Apr11_23.pdf (950.25 KB)
GNWT-INF - Spill Contingency Plan - Apr11_23.pdf (419.25 KB)
GNWT-INF - Renewal Application - Apr11_23.pdf (650.72 KB)
GNWT-INF - Equipment List - Apr11_23.pdf (134.24 KB)
GNWT-INF - List of Quarries and Pit Run - Apr11_23.pdf (432.1 KB)
GNWT-INF - Maps - Apr11_23.pdf (1.97 MB)
GNWT-INF - Waste Management Plan - Apr11_23.pdf (471.62 KB)
Preliminary Screening
Document Received/Sent Uploaded
GNWT-INF - Notification - Preliminary Screening Determination - May31_23.pdf (208.82 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
GNWT-INF - Inspection Report (Sambaa K'e)- January 29, 2025 - Feb3_25.pdf (2.4 MB)
GNWT-INF - Inspection Report (Wrigley to Blackwater River) - January 7, 2025 - Feb3_25.pdf (1.92 MB)
GNWT-INF - Inspection Report - September 27, 2024 - Oct7_24.pdf (1.02 MB)
GNWT-INF - Inspection Report - September 23, 2024 - Oct2_24.pdf (782.09 KB)
GNWT-INF - Inspection Report - KM 414 - August 19, 2024 - Sep4_24.pdf (3.51 MB)
GNWT-INF - Inspection Report - KM 350 - August 19, 2024 - Sep4_24.pdf (4.81 MB)
GNWT-INF - Inspection Report - May 23, 2024 - May30_24.pdf (3.1 MB)
GNWT-INF - Inspection Report - May 17, 2024 - May31_24.pdf (3.24 MB)
GNWT-INF - Inspection Report - April 8, 2024 - Apr22_24.pdf (8.06 MB)
GNWT-INF - Inspection Report - February 11, 2024 - Mar18_24.pdf (7.84 MB)
GNWT-INF - Inspection Report - February 28, 2024 - Mar13_24.pdf (5.31 MB)