Skip to main content

Imperial Oil Limited - MV2021X0019

​D​uring the months of December 2021 and January 2022, the well will be re-entered to perform a remediation of the existing abandonment. Monitoring of the well will occur before and after remedial works to determine the success of the re-abandonment.



Accompanied by Water Licence MV2021L1-0009

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
8. Closure and Reclamation
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
Imperial Oil - JMR B-48 Closure and Reclamation Plan - DRAFT 2021 - Dec13_24.pdf (3.79 MB)
CRP Progress Report – PAR – RCR
Document Received/Sent Uploaded
Imperial Oil - JMR B-48 Reclamation Monitoring Progress Report 2024 - Dec13_24.pdf (18.48 MB)
Final Closure and Reclamation Plan
Document Received/Sent Uploaded
Imperial Oil - Final Closure and Reclamation Plan with Closure Cost Estimate - Apr20_23.pdf (1.19 MB)
Other
Document Received/Sent Uploaded
Imperial Oil - JMR - Phase II ESA 2024 - Dec13_24.pdf (19.04 MB)