Skip to main content

Imperial Oil Limited - MV2021L1-0009

D​uring the months of December 2021 and January 2022, the well will be re-entered to perform a remediation of the existing abandonment. Monitoring of the well will occur before and after remedial works to determine the success of the re-abandonment.


Accompanied by Land Use Permit MV2021X0019

Uploaded On or After
Uploaded On or Before
Displaying 1 - 11 of 11
8. Closure and Reclamation
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
Imperial Oil - JMR B-48 Closure and Reclamation Plan - DRAFT 2021 - Dec13_24.pdf (3.79 MB)
Imperial Oil - Closure and Reclamation Plan - Response to Oct5_2023 Board Letter Coal-Oil-Sands-Reclamation- Regs -Dec14_23.pdf (222.44 KB)
CRP Progress Report – PAR – RCR
Document Received/Sent Uploaded
Imperial Oil - JMR B-48 Reclamation Monitoring Progress Report 2024 - Dec13_24.pdf (18.48 MB)
Final Closure and Reclamation Plan
Document Received/Sent Uploaded
Imperial Oil - Closure and Reclamation Plan - Response to Oct5_23 - Reclamation-Criteria-Wellsites-Forested-Lands - Dec15_23.pdf (972.44 KB)
Imperial Oil - Closure and Reclamatino Plan - Email from Board Staff - Dec19_23.pdf (257.96 KB)
Imperial Oil - Closure and Reclamation Plan - Response to Oct5_2023 Board Letter -Dec14_23.pdf (6.96 MB)
Imperial Oil – Not Approved - Closure and Reclamation Plan and Security Adjustment - Oct5_23.pdf (320.3 KB)
Imperial Oil – Final Closure and Reclamation Plan with Closure Cost Estimate - Review Summery and Responses - Sep28_23.pdf (424.69 KB)
Imperial Oil - Final Closure and Reclamation Plan with Closure Cost Estimate - Apr20_23.pdf (1.19 MB)
Imperial Oil - Final Closure and Reclamation Plan - Feb28_22.pdf (188.43 KB)
Other
Document Received/Sent Uploaded
Imperial Oil - JMR - Phase II ESA 2024 - Dec13_24.pdf (19.04 MB)