Canadian Zinc Corporation - MV2021D0005
Allied Licence: MV2021L2-0004
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Issuance - Type A Land Use Permit - Aug10_22.pdf (2.62 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Quarry Permit - Confirmation of Payment - Jun23_22.pdf (264.4 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Security Deposit Transfer Accepted - Apr12_23.pdf (266.94 KB) | ||
CZN - Closure Cost Decision - Phase 2 - Dec20_22.xlsm (464.1 KB) | ||
CZN - Closure Cost Decision - Phase 4 - Dec16_22.xlsm (461.47 KB) | ||
CZN - Closure Cost Decision - Phase 1 - Dec16_22.xlsm (596.87 KB) | ||
CZN - Closure Cost Decision - Phase 3 - Dec20_22.xlsm (462.59 KB) | ||
CZN - Security Correspondence - RE Mine Site Security - Oct13_22.pdf (118.32 KB) |