Canadian Zinc Corporation - MV2021D0005
Allied Licence: MV2021L2-0004
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Technical Session - ECCC Response to IR5 - Oct4_21.pdf (259.57 KB) | ||
CZN - Technical Session - Responses to IRs - Sep20_21.pdf (10.69 MB) | ||
CZN - Technical Session - CZN Extension Request for IR Responses - Sep17_21.pdf (165.17 KB) | ||
CZN - Technical Session - Transcript Day 1 (Aug.31) - Sep9_21.pdf (1.9 MB) | ||
CZN - Technical Session - Transcript Day 2 (Sept.1) - Sep9_21.pdf (1.84 MB) | ||
CZN - Technical Session - Transcript Day 3 (Sept.3) - Sep9_21.pdf (1.7 MB) | ||
CZN - Technical Session - Information Request ECCC - Sep7_21.pdf (180.91 KB) | ||
CZN - Technical Session - Information Requests - Sep7_21.pdf (266.4 KB) | ||
CZN - Technical Session - Correspondence Re Eligibility - Sep2_21.pdf (238.1 KB) | ||
CZN - Technical Session Presentation - Aug31_21.pdf (32.51 MB) | ||
CZN - Technical Session Agenda Aug 3- Sept 2 - Aug27_21.pdf (337.31 KB) |