Skip to main content

Hamlet of Fort Providence - MV2020X0001

​Geotechnical investigation drilling to provide engineering design to upgrade the Fort Providence water treatment and supply system (water storage resevior).  

Application withdrawn; eligibility requirements were not met on the IAB lands. Reapplied for and issued as Permit MV2020X0012. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
Ft Providence - Fee Receipt - Application Fee.pdf (335.83 KB)
Ft Providence - Application - Mar11-20.pdf (3.28 MB)
Ft Providence - Draft Land Use Permit Conditions - Mar13_20.pdf (303.36 KB)
Ft Providence - Facsimile Distribution - Mar19-20.pdf (132.41 KB)
Ft Providence - Application - Jan24-20.pdf (3.23 MB)
Ft Providence - Application Incomplete - Feb3-20.pdf (242.22 KB)
Withdrawal - Return - Denial
Document Received/Sent Uploaded
Ft Providence - Geotechnical Investigation - Application Withdrawn - Fee Statement - Apr30-20.pdf (173 KB)
Ft Providence - Application Withdrawal - Apr24_20.pdf (160.52 KB)