Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Uploaded On or After
Uploaded On or Before
Displaying 1 - 31 of 31
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
PPML - 2024 Annual Water Licence Report - Mar 28_25.pdf (668.34 KB)
PPML – 2023 Annual Report - Revisions Required - Mar24_25.pdf (221.77 KB)
PPML – 2023 Annual Report - Review Comment Table - Mar24_25.pdf (379.54 KB)
PPML - 2023 Annual Water Licence Report - Extension Request - Apr 22_24.pdf (509.54 KB)
PPML - 2023 Annual Report - Jun7_24.pdf (13.51 MB)
PPML – Acknowledgement - 2022 Annual Report V1.2- Oct16_23.pdf (162.59 KB)
PPML – 2022 Annual Report - Review Summery Table - Oct16_23.pdf (402.59 KB)
PPML - 2022 Annual Water Licence Report V 1.2 - Aug 21_23.pdf (18.56 MB)
PPML - 2022 Annual Water Licence Report V 1 - Jul14_23.pdf (11.89 MB)
PPML - 2022 Annual Report - Extension Request - Approved - Mar 28_23.pdf (173.35 KB)
Inspection Reports
Document Received/Sent Uploaded
PPML - Inspection Report - February 15, 2023 - Nov3_23.pdf (8.45 MB)
Operations and Notifications
Document Received/Sent Uploaded
PPML - Pump Test Compatability Authorization - Email Chain - Nov29_23.pdf (1.03 MB)
PPML - Pump Test Compatibility Authorization - Nov29_23.pdf (617.24 KB)
PPML - Pump Test Compatability Request and Approval - Nov10_23.pdf (1.38 MB)
PPML - Correspondence Re Water Consumption - Feb 1_23.pdf (491.2 KB)
PPML - Water Compatibility Test Results - Oct7_22.pdf (6.67 MB)
SNP Reports
Document Received/Sent Uploaded
PPML - SNP-1 Report - April 2023 - March 18_25.pdf (1.23 MB)
PPML - SNP-1 Report - February 2023 - March 18_25.pdf (2.66 MB)
PPML - SNP-1 Report - January 2023 - March 18_25.pdf (2.14 MB)
PPML - SNP-1 Report - March 2023 - March 18_25.pdf (4.5 MB)
PPML - SNP-1 Report - November 2023 - March 18_25.pdf (8.24 MB)
PPML - SNP-1 Report - October 2023 - March 18_25.pdf (3.08 MB)
PPML - SNP-1 Report - April 2024 - March 18_25.pdf (432.85 KB)
PPML - SNP-1 Report - February 2024 - March 18_25.pdf (1.72 MB)
PPML - SNP-1 Report - November 2024 - March 18_25.pdf (2.38 MB)
PPML - SNP-1 Report - October 2024 - March 18_25.pdf (1.25 MB)
PPML - SNP-1 Report - May 2023 - March 18_25.pdf (1.27 MB)
PPML - SNP-1 Report - January 2024 - March 18_25.pdf (714.68 KB)
PPML - SNP-1 Report - March 2024 - March 18_25.pdf (1.96 MB)
PPML - Correspondence Re SNP Reports - Feb 11_25.pdf (443.87 KB)
PPML – QAQC Plan and Approval Letter – Jun26_24.pdf (24.46 MB)