Pine Point Mining Limited - MV2020L8-0012
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
December 8, 2021
Expiry:
December 7, 2028
Staff:
Kim Murray
Pine Point Confirmation and Exploration Program:
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.
Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board
Displaying 1 - 31 of 31
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
PPML - 2024 Annual Water Licence Report - Mar 28_25.pdf (668.34 KB) | ||
PPML – 2023 Annual Report - Revisions Required - Mar24_25.pdf (221.77 KB) | ||
PPML – 2023 Annual Report - Review Comment Table - Mar24_25.pdf (379.54 KB) | ||
PPML - 2023 Annual Water Licence Report - Extension Request - Apr 22_24.pdf (509.54 KB) | ||
PPML - 2023 Annual Report - Jun7_24.pdf (13.51 MB) | ||
PPML – Acknowledgement - 2022 Annual Report V1.2- Oct16_23.pdf (162.59 KB) | ||
PPML – 2022 Annual Report - Review Summery Table - Oct16_23.pdf (402.59 KB) | ||
PPML - 2022 Annual Water Licence Report V 1.2 - Aug 21_23.pdf (18.56 MB) | ||
PPML - 2022 Annual Water Licence Report V 1 - Jul14_23.pdf (11.89 MB) | ||
PPML - 2022 Annual Report - Extension Request - Approved - Mar 28_23.pdf (173.35 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Inspection Report - February 15, 2023 - Nov3_23.pdf (8.45 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Pump Test Compatability Authorization - Email Chain - Nov29_23.pdf (1.03 MB) | ||
PPML - Pump Test Compatibility Authorization - Nov29_23.pdf (617.24 KB) | ||
PPML - Pump Test Compatability Request and Approval - Nov10_23.pdf (1.38 MB) | ||
PPML - Correspondence Re Water Consumption - Feb 1_23.pdf (491.2 KB) | ||
PPML - Water Compatibility Test Results - Oct7_22.pdf (6.67 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - SNP-1 Report - April 2023 - March 18_25.pdf (1.23 MB) | ||
PPML - SNP-1 Report - February 2023 - March 18_25.pdf (2.66 MB) | ||
PPML - SNP-1 Report - January 2023 - March 18_25.pdf (2.14 MB) | ||
PPML - SNP-1 Report - March 2023 - March 18_25.pdf (4.5 MB) | ||
PPML - SNP-1 Report - November 2023 - March 18_25.pdf (8.24 MB) | ||
PPML - SNP-1 Report - October 2023 - March 18_25.pdf (3.08 MB) | ||
PPML - SNP-1 Report - April 2024 - March 18_25.pdf (432.85 KB) | ||
PPML - SNP-1 Report - February 2024 - March 18_25.pdf (1.72 MB) | ||
PPML - SNP-1 Report - November 2024 - March 18_25.pdf (2.38 MB) | ||
PPML - SNP-1 Report - October 2024 - March 18_25.pdf (1.25 MB) | ||
PPML - SNP-1 Report - May 2023 - March 18_25.pdf (1.27 MB) | ||
PPML - SNP-1 Report - January 2024 - March 18_25.pdf (714.68 KB) | ||
PPML - SNP-1 Report - March 2024 - March 18_25.pdf (1.96 MB) | ||
PPML - Correspondence Re SNP Reports - Feb 11_25.pdf (443.87 KB) | ||
PPML – QAQC Plan and Approval Letter – Jun26_24.pdf (24.46 MB) |