Pine Point Mining Limited - MV2020L8-0012
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
December 8, 2021
Expiry:
December 7, 2028
Staff:
Kim Murray
Pine Point Confirmation and Exploration Program:
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.
Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board
Displaying 1 - 5 of 5
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
PPML - ESMP V1.1 - Board staff Confirmation of Conformity.pdf (161.46 KB) | ||
PPML - Erosion and Sedimentation Management Plan - Version 1.1 - Jan 31_25.pdf (6.85 MB) | ||
PPML – Erosion and Sedimentation Management Plan – V1 - Review Comment Table - Oct25_24.pdf (373.03 KB) | ||
PPML – Erosion and Sedimentation Management Plan – V1 - Revisions Required - Oct28_24.pdf (210.4 KB) | ||
PPML - Erosion and Sediment Control Plan V1 - Sep8_24.pdf (17.57 MB) |