Skip to main content

Pine Point Mining Limited - MV2020L8-0012

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits; definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; andfuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
6. Management Plans
Sediment and Erosion Control
Document Received/Sent Uploaded
PPML - ESMP V1.1 - Board staff Confirmation of Conformity.pdf (161.46 KB)
PPML - Erosion and Sedimentation Management Plan - Version 1.1 - Jan 31_25.pdf (6.85 MB)
PPML – Erosion and Sedimentation Management Plan – V1 - Review Comment Table - Oct25_24.pdf (373.03 KB)
PPML – Erosion and Sedimentation Management Plan – V1 - Revisions Required - Oct28_24.pdf (210.4 KB)
PPML - Erosion and Sediment Control Plan V1 - Sep8_24.pdf (17.57 MB)