GNWT-INF - MV2020L8-0004
GNWT - INF is proposing to place clean armour stone to protect the road embankments at the North ferry landing from ice scour. Also, a deteriorating concerte vault on the South ferry landing is to be covered with armour stone to prevent exposed reinforcing steel and concrete from further erosion into the river. There is a large stockpile of clean armour stone near the Bridge. The work plan involved loading the stone in a dump truck, hauling it to the roadway, then placing the stone with an excavator. A rubber-itred loader will be used to load the trucks then feed the stone to the excavator. Each stone will be picked up and placed individually by the excavator which will have a thumb with the bucket to hold the stones while placing them. The placing of the stone will begin with the largest armour stone being placed at the toe of the embankment at the waterline.
Documents
Document | Received/Sent | Uploaded |
---|---|---|
MV2020L8-0004 - GNWT - INF - Issuance - Type B Water Licence - Oct1-20.pdf (883.07 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2020L8-0004 - GNWT- INF - Additional Information - Aug5_20.pdf (208.81 KB) | ||
MV2020L8-0004 - GNWT- INF - Additional Information - July30_20.pdf (5.3 MB) | ||
GNWT - INF - MV2020L8-0004 - Engagement Plan - June23_20.pdf (4.23 MB) | ||
GNWT - INF - MV2020L8-0004 - Water Licence Application - June23_20.pdf (8.55 MB) | ||
GNWT - INF - MV2020L8-0004 - Waste Management Plan - June23_20.pdf (414.27 KB) | ||
GNWT - INF - MV2020L8-0004 - Spill Contingency Plan - June23_20.pdf (6.62 MB) | ||
MV2020L8-0004 - GNWT - INF - Water Licence - Incomplete Letter - June24_20.pdf (199.93 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2020L8-0004 - GNWT- INF - Notice of Application - Aug24_20.pdf (537.87 KB) | ||
MV2020L8-0004 - GNWT - INF - Draft Water Licence Conditions - Aug12_20.docx (203.38 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2020L8-0004 - GNWT-INF - Preliminary Screening Notification to Review Board - Sept18-20.pdf (490.4 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - 2021 Annual Report - Mar31_22.pdf (1.59 MB) | ||
MV2020L8-0004 - GNWT - INF - 2020 Dehcho Bridge Ferry Landing Annual Report - Feb25_21.pdf (271.51 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Erosion Control Work - Project Completed - Email Correspondence - Aug27_21.pdf (169.71 KB) | ||
GNWT-INF - Erosion Control Project at Dehcho Bridge Abandon Ferry Landings Completed - Aug27_21.pdf (1.37 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - MV2020L8-0004 - Engagement Plan V1- June23_20.pdf (4.23 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - MV2020L8-0004 - Spill Contingency Plan V1- June23_20.pdf (6.62 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - MV2020L8-0004 - Waste Management Plan V1- June23_20.pdf (414.27 KB) |