Pine Point Mining Limited - MV2020L2-0008
Status:
Expired
Authorization:
Licence
Activity:
Mining and Milling
Start:
October 9, 2020
Expiry:
October 8, 2022
Staff:
Kim Murray
Mineral Exploration in the Pine Point. Associated activities proposed include geological mapping, sampling, diamond drilling,
use of water for drilling and deposit of drilling waste, use of heavy machinery and vehicles, use and
storage of fuel, clearing vegetation from existing roads and cut lines, and site restoration.
Displaying 1 - 20 of 20
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
MV2018C0005 MV2020L2-0008 - PPML - Permit Extension and Licence Renewal - Staff Report and Comments - Oct7-20.pdf (1.57 MB) | ||
MV2020L2-0008 - PPML - Issuance - Type B Water Licence - Oct9-20.pdf (751.89 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Letter from ENR Re Security Deposit Return - Jan3_23.pdf (519.57 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
MV2020L2-0008- PPML - Receipt - Application Fee - Sept 5_20.pdf (36.6 KB) | ||
MV2020L2-0008 - PPML - News North Ad - Sept7-20.pdf (1.61 MB) | ||
MV2020L2-0008 - PPML - draft Licence Conditions.pdf (269.55 KB) | ||
MV2020L2-0008 MV2018C0005 - PPML - Engagement_Record - Aug28_20.pdf (3.59 MB) | ||
MV2020L2-0008 MV2018C0005 - PPML - Engagement Plan - Aug28_20.pdf (213.98 KB) | ||
MV2020L2-0008 MV2018C0005 - PPML - Spill Contingency Plan - Aug26_20.pdf (5.08 MB) | ||
MV2020L2-0008 MV2018C0005 - PPML - Permit Extension Licence Renewal Applications - Aug26_20.pdf (1.01 MB) | ||
MV2020L2-0008 MV2018C0005 - PPML - Waste Management Plan - Aug26_20.pdf (667.8 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
PPML – Acknowledgement - 2022 Annual Report V1.2 - Oct16_23.pdf (160.75 KB) | ||
PPML – 2022 Annual Report - Review Summery Table - Oct16_23.pdf (402.6 KB) | ||
PPML - 2022 Annual Water Licence Report V 1.2 - Aug 21_23.pdf (18.56 MB) | ||
PPML - 2022 Annual Water Licence Report V 1 - Jul14_23.pdf (11.89 MB) | ||
PPML - 2021 Annual Report - Mar30_22.pdf (1.18 MB) | ||
MV2020L2-0008 - PPML - Acknowledgment - 2020 Annual Report - June 3 2021 - Jun17-21.pdf (116.68 KB) | ||
MV2020L2-0008 – PPML– 2020 Annual Report - Staff Report - Jun17_21.pdf (167.9 KB) | ||
PPML - 2020 Annual Water Licence Report - Apr 16_21.pdf (1.65 MB) |
7. Monitoring Programs
Document | Received/Sent | Uploaded |
---|---|---|
Pine Point - 2022 Annual Wildlife Management and Monitoring Plan Report - Aug 31_23.pdf (12.34 MB) |