Skip to main content

Pine Point Mining Limited - MV2020C0017

Pine Point Confirmation and Exploration Program: 
exploration by drilling/pitting to find additional mineral deposits;
definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; and
fuel storage.

Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
8. Closure and Reclamation
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
PPML – Closure and Reclamation Plan Version 2.0 - Not Approved - Nov21_24.pdf (498.74 KB)
PPML – Closure and Reclamation Plan Version 2.0 - Reveiw Comment Table - Nov21_24.pdf (555.66 KB)
PPML - Closure and Reclamation Plan - V2 - May9__24.pdf (1.93 MB)