Pine Point Mining Limited - MV2020C0017
Status:
Issued
Authorization:
Land Use Permit
Activity:
Mining Exploration
Start:
November 2, 2021
Expiry:
November 11, 2026
Staff:
Kim Murray
Pine Point Confirmation and Exploration Program:
exploration by drilling/pitting to find additional mineral deposits;
definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; and
fuel storage.
Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board
exploration by drilling/pitting to find additional mineral deposits;
definition core drilling of the known mineral deposits to establish the extent and grade of the mineralization;geotechnical investigations by core drilling and test pitting;collection of metallurgical test samples of rock by small scale quarrying and collection of pit water samples;establishing groundwater recharge and discharge rates for existing pits and water reinjection wells;use of heavy machinery and vehicles;construction and maintenance of camps; and
fuel storage.
Please note that there is a separate Pine Point Mining Limited environmental assessment proceeding for Mining and Milling activities at Pine Point with the Mackenzie Valley Review Board (EA2021-01). There is no MVLWB Licence or Permit number associated with this environmental assessment. Pine Point Mine Project - EA2021-01 | Review Board
Displaying 1 - 9 of 9
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Engagement Plan - V2.2 - Conformity Confirmation - Apr22_22.pdf (148.99 KB) | ||
PPML - Engagement Plan V2.2 - Apr6_22.pdf (337.41 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Spill Contingency Plan - Version 1.3 - Jan 31_25.pdf (9.33 MB) | ||
PPML - Spill Contingency Plan - Version 1.2 - Sept 12_24.pdf (8.42 MB) | ||
PPML - Spill Contingency Plan - V1.1 - Conformity Confirmation - Apr22_22.pdf (157.5 KB) | ||
PPML - Spill Contingency Plan V1.1 - Apr6_22.pdf (8.39 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Waste Management Plan - V1.3 - Conformity Confirmation - Apr22_22.pdf (158.53 KB) | ||
PPML - Waste Management Plan V1.3 - Apr6_22.pdf (1.19 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
PPML - Water Management Plan V1.1 - Jul4_22.pdf (1003.07 KB) |