Northwest Territories Power Corporation - MV2019L1-0001
Status:
Issued
Authorization:
Licence
Activity:
Power
Start:
October 18, 2019
Expiry:
October 17, 2044
Staff:
Tyree Mullaney
Jackfish Power Generating Facility, located on the northeast shore of Jackfish Lake in Yellowknife, Northwest Territories. The facility contributes power to the North Slave electrical system when required.
Previously licenced by Water Licence N1L1-1632.
Previously licenced by Water Licence N1L1-1632.
Documents
- AEMP - Program (16)
- All Issuances (5)
- Annual Reports (19)
- Application and Related Docs (10)
- Conceptual Closure and Reclamation Plan (2)
- Consultations - Reviews - Work Plans (9)
- Engagement Plan (2)
- GIS Data (1)
- Inspection Reports (1)
- Interim Closure and Reclamation Plan (4)
- Operations and Notifications (6)
- Other (29)
- Other Monitoring Program (1)
- Preliminary Screening (2)
- Public Hearing (9)
- Security and Water Use Fees (1)
- SNP Program (4)
- SNP Reports (89)
- Spill - Contingency - Emergency Response (1)
- Spill Reports (1)
- Technical Session (7)
- Waste Management Plan (1)
Displaying 1 - 100 of 220
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Jackfish - Approval - Compliance Date Change - May18_23.pdf (590.68 KB) | ||
NTPC - Jackfish – Approval - Compliance Date Change - Mar7_23.pdf (581.12 KB) | ||
NTPC - Submission Deferral - Staff Report and Comments - Apr22-21.pdf (320.33 KB) | ||
NTPC - Approval - Submission Deferral - Apr29-21.pdf (528.76 KB) | ||
NTPC - Issuance - Type A Water Licence - Oct18-19.pdf (824.09 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Crown Corporation Letter to MVLWB - Apr11-12.pdf (104.73 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Issuance - Staff Report - Sep26_19.pdf (280.88 KB) | ||
NTPC - Board Recommendation for Approval - Type A Water Licence - Issuance - Sep27-19.pdf (747.43 KB) | ||
NTPC - Notification - Board Recommendation for Approval - Sep27-19.pdf (125.16 KB) | ||
NTPC - New LUP Application - Figure 2-2 - SPC - Mar1-19.pdf (555.21 KB) | ||
NTPC - Waste Management Plan - Feb26-19.pdf (859.06 KB) | ||
NTPC - Conceptual Abandonment and Restoration Plan - Feb26-19.pdf (218.82 KB) | ||
NTPC - Engagement Plan - Feb26-19.pdf (717.92 KB) | ||
NTPC - Engagement Log - Feb26-19.pdf (1.36 MB) | ||
NTPC - New Water Licence Application - Feb26-19.pdf (19.34 MB) | ||
NTPC - Spill Contingency Plan - Feb26-19.pdf (1.41 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Comment Summary Table - Draft Condition Review - Sep4_19.pdf (841.5 KB) | ||
NTPC - Request for comments on the New Water Licence Application - Jul23-19.pdf (337.28 KB) | ||
NTPC - DRAFT Water Licence Conditions.docx (163.46 KB) | ||
NTPC - Comments and Responses - Initial Application - Apr16-19.pdf (3.15 MB) | ||
NTPC - Staff Report - Workplan - Apr4-19.pdf (161.93 KB) | ||
NTPC - GNWT ENR Comments on Draft Work Plan - Mar18-19.pdf (11.85 KB) | ||
NTPC - Newspaper Ad - Application - Mar11-19.pdf (588.61 KB) | ||
NTPC - Request for comments on WL Application - Mar6-19.pdf (328.55 KB) | ||
NTPC - Type A Water Licence Renewal - Work Plan V1 - External - Mar4-19.docx (48.36 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Preliminary Screening Determination - May1-19.pdf (339.06 KB) | ||
NTPC - Preliminary Screening Determination - Staff Report and Comments - May1-19.pdf (3.29 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Type A Water Licence - Renewal - Notice of Cancellation of Public Hearing - Jul22-19.pdf (376.66 KB) | ||
NTPC - Type A Water Licence Renewal - Work Plan V2 - External - Jul22-19.pdf (157.06 KB) | ||
NTPC - Public Hearing Ad - Cancellation of Public Hearing - Jul22-19.pdf (867.67 KB) | ||
NTPC - ENR Intervention - Jun11-19.pdf (112.28 KB) | ||
NTPC - ECCC Intervention - Jun11-19.pdf (257.78 KB) | ||
NTPC - Pre-Hearing Conference - Summary Notes - May29-19.pdf (49.64 KB) | ||
NTPC - Pre-Hearing Conference Meeting Notes and Sign in Sheet - May28-19.pdf (250.17 KB) | ||
NTPC - Public Hearing Ad - May20-19.pdf (742.89 KB) | ||
NTPC - Type A Water Licence - Prehearing Conference - May16-19.pdf (267.47 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Type A WL - Technical Session - Response to Information Requests - May22-19.pdf (1.1 MB) | ||
NTPC - Technical Session - Sign-in Sheet - May2-19.pdf (89.48 KB) | ||
NTPC - Technical Session Transcripts for May 2 2019 - May5-19.pdf (544.05 KB) | ||
NTPC - Technical Session Presentation - May2-19.pdf (3.39 MB) | ||
NTPC - Type A Water Licence - Technical Session - Information Requests - May2-19.pdf (365.61 KB) | ||
NTPC - Technical Session Agenda - Apr17-19.pdf (436.14 KB) | ||
NTPC - Technical Session Agenda - Apr17-19.pdf (215.73 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Jackfish - Inspection Report - August 9, 2023 - Sep25_23.pdf (1.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Spill Report - Jan26_24.pdf (1.23 MB) | ||
MV2019L1-0001 - NTPC - Jackfish- Operations Maintenance and Surveillance Manual - Feb26_21.pdf (2.21 MB) | ||
MV2019L1-0001 - NTPC - Jackfish - Water Quality Technical Memo - Sept23_20.pdf (3.44 MB) | ||
MV2019L1-0001 - NTPC - Jackfish - Request for Extension of Submission Dates - Apr23_20.pdf (118.06 KB) | ||
MV2019L1-0001 - NTPC - Jackfish - Thermal Plume Delineation Study Design Plan and SOP - Jan28_20.pdf (164.52 KB) | ||
MV2019L1-0001 - NTPC - Jackfish Lake Generating Facility- Operations Maintenance and Surveillance Manual V1- Jan16_20.pdf (2.21 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2019L1-0001 - NTPC - Jackfish SNP January 2021 - March29_21.pdf (576.71 KB) | ||
MV2019L1-0001 - NTPC - Jackfish SNP February 2021 - March29_21.pdf (635.62 KB) |