TDC Contracting Ltd. - MV2018Q0019
- All maps from Natural Resources Canada
200 km
Status:
Issued
Authorization:
Land Use Permit
Activity:
Quarrying
Start:
October 26, 2018
Expiry:
October 25, 2025
Staff:
Emma Junker
Heavy equipment will be used to quarry, crush, stock pile and haul granular material from the site to Fort Smith, NT and area.
Displaying 1 - 6 of 6
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
TDC Contracting Ltd. - Inspection Report - 2024-04-24 - May1_24.pdf (2.86 MB) | ||
TDC Contracting - Inspection Report - May 31, 2023 - Jul4_23.pdf (2.81 MB) | ||
TDC Contracting - Inspection Report - May 27, 2022 - Jun8_22.pdf (1.52 MB) | ||
MV2018Q0019 - TDC Contracting Ltd. - Quarry Inspection Report - May 21-21.pdf (11.06 MB) | ||
MV2018Q0019 - TDC Constracting - Inspection Report for June 6 2019 - GNWT Lands - Jun14-19.pdf (970.13 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2018Q0019 - TDC Contracting Ltd. - Quarry Permit Application Acknowledgement - Oct17-19.pdf (218.4 KB) |