CJ Contracting Ltd. - MV2018Q0006

Development of a quarry 3.5km west of the Hwy 3 / Deh Cho Blvd intersection including the construction of a 500m access road, installation of a scale, fuel storage, and a temporary building. The crushed rock will be used to support local construction projects, and will also be made available for sale to the public.  Quarrying equipment may be stored on the site. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
CJ Contracting - Inspection Report - Sep17_24.pdf (5.05 MB)
CJ Contracting - Inspection Report - November 2 2021 - Nov5_21.pdf (2.6 MB)
CJ Contracting - September 24 2020 Inspection Report - Sep28_20.pdf (1.86 MB)
CJ Contracting - Inspection Report for May 28 2019 - GNWT Lands - Jun5-19.pdf (2.34 MB)
CJ Construction - Inspection Report for August 16 and September 7 2018 - GNWT Lands - Sep11-18.pdf (1.24 MB)