Pine Point Mining Limited - MV2018L2-0003
Status:
Expired
Authorization:
Licence
Activity:
Mining and Milling
Start:
June 20, 2018
Expiry:
September 19, 2020
Staff:
Kim Murray
Conformitory drilling to support a fesaibility study in the Pine Point Disctrict. Water will be used to operate individual drills. Water will be sources from existing constructed features including mine pits and drainage ditches.
Accompanied by Permit MV2018C0005. This project is split-interest and occurs in non-federal and federal areas.
Displaying 1 - 11 of 11
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
MV2018L2-0003 - PPML - 2019 Annual Report with Waste Manifest - Aug12-20.pdf (1.8 MB) | ||
MV2018L2-0003 - PPML - 2019 Annual Report - Staff Report - Jun16-20.pdf (212.77 KB) | ||
MV2018L2-0003 - PPML - Accepted - 2019 Annual Report - May 28 2020 - Jun3-20.pdf (169.67 KB) | ||
MV2018L2-0003 - PPML - 2019 Annual Water Licence Report - May 8-20.pdf (1.17 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2018L2-0003 - PPML - Response to 2018 Inspection Report - Mar19-19.pdf (135.94 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2018C0005 MV2018L2-0003 - PPML - Drilling Tartget and Water Source Notification - Drill pads 053 area - Jul24-18.pdf (1.56 MB) | ||
MV2018L2-0003 - PPML - Water Source Notification - Jul20-18.pdf (377.14 KB) | ||
MV2018C0005 MV2018L2-0013 - PPML - Drilling Target Notification - Jul24-18.pdf (6.38 MB) | ||
MV2018C0005 MV2018L2-0013 - PPML - Drilling Target and Water Source Notification - Jul24-18.pdf (1.77 MB) | ||
MV2018C0005 MV2018L2-0003 - PPML - Drilling Tartget and Water Source Notification - Jul24-18.pdf (1.9 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2018C0005 MV2018L2-0003 - PPML - Notice of Spill Reports - Aug13-18.pdf (981.97 KB) |