Gold Terra Resource Corp. - MV2018C0023
Status:
Issued
Authorization:
Land Use Permit
Activity:
Mining Exploration
Start:
January 17, 2019
Expiry:
January 16, 2026
Staff:
Kim Murray
The purpose of the proposed work program for the Yellowknife City Gold Project is to explore for gold and base metals (zinc, copper, molybdenum) via diamond drilling activities and below threshold surface exploration, such as mapping, prospecting, geochemical sampling and geophysical surveys.
Previously authorized by Permits MV2014C0005 and MV2016C0038.
Displaying 1 - 10 of 10
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
Gold Terra - Notification - Drilling Commenced - Apr17_23.pdf (139.33 KB) | ||
Gold Terra - Drilling Notification Email - Apr11_23.pdf (124.58 KB) | ||
Gold Terra - Walsh Lake Drilling Cleanup Photos - May9_22.pdf (14.99 MB) | ||
Gold Terra - Water Usage for January and Pumps and Sump locations - Feb15_22.pdf (304.22 KB) | ||
Gold Terra - Notification - 2022 Winter Drilling Start-Up - Jan3_22.pdf (1.61 MB) | ||
Gold Terra - 2020 Drilling Start Up Notification - Aug6-20.pdf (2.31 MB) | ||
Gold Terra - 2020 Shut Down Notification - Apr1_20.pdf (195.5 KB) | ||
TerraX - 2019 Commencement of Operation - Dec11 - 19.pdf (3.71 MB) | ||
TerraX - 2019 Shut Down Notification - Aug20-19.pdf (182.93 KB) | ||
TerraX - 2019 Drilling Notification - Jun26-19.pdf (11.6 MB) |