Enbridge Pipelines (NW) Inc. - MV2017P0013
Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.
Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.
Associated Water Licence: MV2017L1-0002.Documents
- All Issuances (2)
- Application and Related Docs (22)
- Conceptual Closure and Reclamation Plan (1)
- Consultations - Reviews - Work Plans (33)
- Engagement Plan (5)
- External Authorizations (5)
- Final Plan and Clearance (5)
- Further Study Requested Sec. 22.2.b (3)
- GIS Data (1)
- Inspection Reports (23)
- Operations and Notifications (4)
- Preliminary Screening (5)
- Public Hearing (72)
- Security and Water Use Fees (1)
- Shapefiles (1)
- Spill - Contingency - Emergency Response (1)
- Technical Session (1)
- Waste Management Plan (13)
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 - Enbridge - Issuance Letter with Permit and Conditions - RFD - Feb2-18.pdf (1.25 MB) | ||
MV2017P0013 - Enbridge - Reason for Decision - Issuance - Feb16-18.pdf (4.66 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
Enbridge – Approval - Final Plan and Clearance - Mar 8_24.pdf (174.3 KB) | ||
Enbridge - Final Plan - Inspector Recommendation - Jan 31_24.pdf (287.77 KB) | ||
Enbridge - Final Plan - Inspector Recommendation - Jan 17_24.pdf (165.16 KB) | ||
MV2017P0013 - Enbridge - Final Plan - Mar 31_23.pdf (731.93 KB) | ||
MV2017P0013 - Enbridge - Final Plan Request - Feb 17_23.pdf (196.66 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 - Enbridge - Review Comment Table from Applications - May 25_17.pdf (808.14 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 - Enbridge Pipelines - Acknowledgement Letter for Receipt of Security Deposit - GNWT Lands - Mar15-18.pdf (147.7 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan Version 1 - Approved - Aug17-17.pdf (778.38 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 - Enbridge Pipelines NW Inc - Further Study Required - Staff Report - May25-17.pdf (438.14 KB) | ||
MV2017P0013 - Enbridge Pipelines NW Inc - Further Study Required - May31-17.pdf (703.41 KB) |