Skip to main content

Miramar Northern Mining Ltd. - MV2017L8-0008

​Closure and Reclamation of Con Mine 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 18 of 18
5. Reports and Studies
Other
Document Received/Sent Uploaded
MNML - Con Mine - 204Q Stope Drilling Investigation Data Review and Cover Letter - Mar18_25.pdf (23.41 MB)
MNML - Con Mine - Chloride Treatment Options Report V1.1 - Mar28_24.pdf (939.23 KB)
MNML - Con Mine - Chloride Treatment Options Report V1.1 - Conformity - Apr2_24.pdf (147.88 KB)
MNML – Con Mine – Revisions Required - Chloride Treatment Options Report V1 - Mar19_24.pdf (217.04 KB)
MNML – Con Mine – Chloride Treatment Options Report V1 - Review Comment Table - Mar15_24.pdf (489.45 KB)
MNML - Con Mine - Chloride Treatment Options Report - Nov30_23.pdf (1.61 MB)
MNML - Con Mine - Sediment Sampling Results - Jun7_23.pdf (1.58 MB)
MNML - Con Mine - Sediment Sampling Results - RAW DATA - Jun7_23.xlsx (49.63 KB)
MNML - Con Mine - 2020 Groundwater Monitoring - Feb3_23.pdf (5.91 MB)
MNML - Con Mine - 2021 Groundwater Report - Feb2_23.pdf (9.11 MB)
MNML - Con Mine - 2019 Groundwater Report - Feb2_23.pdf (12.51 MB)
MNML - Con Mine - 2022 Status of the Environment Report - Jun7_22.pdf (9.29 MB)
MNML - Con Mine - Construction Plan for Sump improvements in the SNP 0025-9 SNP 0040-9 Area - May27_21.pdf (6.99 MB)
MNML - Con Mine - 2019 Dam Safety Review - Mar31_21.pdf (18.79 MB)
MNML - Con Mine - MKP Study Design - Dec7_20.pdf (154.64 MB)
MNML - Con Mine - SOP and QAQC for Effluent and Water Quality Monitoring - Sep13_19.pdf (28.45 MB)
MNML - Con Mine - Phase 6 EEM-IOC Final Report - Jun13-19.pdf (16.39 MB)
MNML - Con Mine - Request for comments on the Standard Operating procedures and QA-QC Plan - May16-19.pdf (361.45 KB)