Skip to main content

Environment Canada - MV2015X0009

​The  goal  of  the  fuel  storage  tank  system  decommissioning  plan  at  Fort  Reliance  is  to permanently withdraw  from  service  and  remove  the  tank  system  as per  the  requirements  outlined  in the  Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations (SOR/2008-197) and all
applicable Territorial requirements and best management practices. This includes removing any remaining product/sludge from all tanks, associated piping infrastructure and associated equipment, purging the tanks of vapours, removing the tanks from the site, and disposing of the tank system and waste products as appropriate. The existing containment structures will also be decommissioned as part of this program whereby liner systems  and concrete containment structures will be disassembled and shipped off-site for disposal or recycling.


It is not expectedthat any campwill be set up.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 18 of 18
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2015X0009 - Environment Canada - Final Clearance Letter - Feb9-17.pdf (163.96 KB)
MV2015X0009 - Environment Canada - Issuance Letter with Conditions and RFD - Type A Land Use Permit - Jul16-15.pdf (375.7 KB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2015X0009 - EC - Response to Request for final plan - INAC Inspector - Aug8-16.pdf (89.84 KB)
MV2015X0009 - Environment Canada - Final Clearance - Staff Report - Feb9-17.pdf (298.73 KB)
MV2015X0009 - ECCC - Fort Resolution - Inspectors recommendation for final clearance - INAC - Dec28-16.pdf (99.51 KB)
MV2015X0009 - EC - Fort Resolution - Final Plan submission - Dec21-16.pdf (2.4 MB)
MV2015X0009 - EC - Request for final plan submission - Aug8-16.pdf (110.08 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2015X0009 - Environment Canada - Staff Report and Comments - Issuance - Jul16-15.pdf (810.02 KB)
MV2015X0009 - Environment Canada - draft LUP conditions - June 2015.pdf (467.73 KB)
MV2015X0009 - Environment Canada - New LUP Application - Jun5-15.pdf (11.36 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2015X0009 - Environment Canada - Request for comments on New LUP Application - Jun11-15.pdf (191.78 KB)
Preliminary Screening
Document Received/Sent Uploaded
MV2015X0009 - Environment Canada - Preliminary Screening Report - Type A Land Use Permit Issuance - Jul16-15.pdf (224.78 KB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2015X0009 - EC - Annual Report for 2015 - Dec20-16.pdf (3.2 MB)
Inspection Reports
Document Received/Sent Uploaded
MV2015X0009 - EC - Inspection Report for September 7 2016 - INAC Inspector - Sept22-16.pdf (210.76 KB)
MV2015X0009 - EC - Fort Reliance - Response to November 12 2015 Inspection Report - Nov20-15.pdf (118.42 KB)
MV2015X0009 - EC - Fort Reliance - Inspection Report for November 12 2015 - AANDC Inspector - Nov19-15.pdf (290.81 KB)
6. Management Plans
Sediment and Erosion Control
Document Received/Sent Uploaded
MV2015X0009 - Environment Canada - Sediment and Erosion Control Plan - Oct2-15.pdf (829.87 KB)
MV2015X0009 - Environment Canada - Response to Erosion and Sediment Control Plan - Oct2-15.pdf (188.06 KB)