North American Tungsten - MV2015L2-0003
Status:
Expired
Authorization:
Licence
Activity:
Mining and Milling
Start:
January 28, 2016
Expiry:
January 27, 2024
Staff:
Kim Murray
Cantung; mining and milling. Water discharge to the Flat River.
Refer also to previous Licence MV2002L2-0019
Documents
- AEMP - Annual Report (1)
- AEMP - Program (4)
- All Issuances (10)
- Annual Reports (70)
- Application and Related Docs (8)
- Assorted Management Plans (20)
- Consultations - Reviews - Work Plans (15)
- Court Decisions (19)
- Designs and As-Builts (3)
- Engagement Plan (11)
- Inspection Reports (19)
- Interim Closure and Reclamation Plan (17)
- Modifications (17)
- Operations and Notifications (20)
- Other (16)
- Preliminary Screening (2)
- Progress Reports (6)
- Public Hearing (38)
- Security and Water Use Fees (10)
- Sediment and Erosion Control (3)
- SNP Program (10)
- SNP Reports (151)
- Spill - Contingency - Emergency Response (7)
- Spill Reports (9)
- Technical Session (12)
- Waste Management Plan (2)
- Waste Rock and Tailings Management (8)
Displaying 401 - 500 of 508
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Follow Up Report Re Spill Report Apr 16 - Transformer Leaks - May 2_23.pdf (872.82 KB) | ||
NATCL - Follow up Re Spill Report Apr 16 - Transformer Leaks - Apr 26_23.pdf (209.49 KB) | ||
NATCL - Spill Report Transformer Leaks - Apr 16 - Apr 21_23.pdf (618.68 KB) | ||
NATCL - Spill Report - Follow-up - Nov5_21.pdf (1.24 MB) | ||
NATCL - Spill Report 2019-17 - Jun24_19.pdf (1.68 MB) | ||
NATCL - Response from Inspector to NATCL regarding TSS and pH Exceedance - Sep30-16.pdf (126.54 KB) | ||
NATCL - TSS Exceedance - Notification - Sep23-16.pdf (2.74 MB) | ||
NATCL - Follow up to Spill Report 16-161 - Diesel Contaminated Water Follow - May27-16.pdf (2.07 MB) | ||
NATCL - Follow up on Spill Report 16-163 - May19-16.pdf (1.78 MB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Request for comment on Report defferal request - Sep22-16.pdf (525.8 KB) | ||
NATCL - Request for an extension on the Geotechnical Load Balance Report - Sep16-16.pdf (56.79 KB) | ||
NATCL - Follow up to Geotechnical Drilling - GNWT Inspector - May27-16.pdf (209.9 KB) | ||
NATCL - Tailings Containment Area Cover Design Study - Dec30-14.pdf (5.46 MB) | ||
NATCL - Tailings Containment Area Monitoring Plan - Aug31-11.pdf (958.77 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Water Management and Minesite Erosion and Sediment Protection Plan V6 - Dec22_23.pdf (9.03 MB) | ||
NATCL - Waste Management and mine-site Erosion and Sediment Protection Plan - Dec30-13.pdf (20.43 MB) | ||
NATCL - Flat River Erosion and Sediment Protection Plan - Dec31-11.pdf (5.1 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Spill Contingency Plan V9 - Dec22_23.pdf (11.3 MB) | ||
NATCL - Approval BMP Extension and SCP - Staff Report and Comments - Jul23-20.pdf (378.62 KB) | ||
NATCL - Approval BMP Extension and SCP - Jul28-20.pdf (172.89 KB) | ||
NATCL - Cantung Mine Spill Contingency Plan V7 - May25_20.pdf (9.63 MB) | ||
NATCL - Spill Contingency Plan and Biopile (Landfarm Management Plan update July 2017 Final - Aug1-17.pdf (6.8 MB) | ||
NATCL - Spill Contingency Plan - Mar31-14.pdf (3.53 MB) | ||
NATCL - Groundwater Pumping Contingency Plan - Aug22-13.pdf (7.98 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Waste Management Plan V8 - Dec22_23.pdf (19.81 MB) | ||
NATCL - Waste Managment Plan - Jan31-14.pdf (12.68 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - LKFN Technical Review of 2022 Dam Safety Review - Jul5_23.pdf (218.99 KB) | ||
NATCL - 2022 Dam Safety Review - Additional Information from NATCL - Jun16_23.pdf (160.72 KB) | ||
NATCL - 2022 Dam Safety Review - Implementation Plan - Additional Information Required - Jun1_23.pdf (239.75 KB) | ||
NATCL - 2022 Dam Safety Review - Report - May15_23.pdf (58.3 MB) | ||
NATCL - 2022 Dam Safety Review - Cover Letter and Response - May15_23.pdf (890.55 KB) | ||
NATCL - OMS Tailings Manual 2018 Update - Sep17-18.pdf (1.91 MB) | ||
NATCL - 2017 Dam Safety Review - Dec31-17.pdf (5.51 MB) | ||
NATCL - Approval - Deferral - Tailings Cover Design Report - Staff Report and Comments - May25-17.pdf (607.25 KB) |
7. Monitoring Programs
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Reqeust to defer AEMP Design Plan Submission - Mar21-18.pdf (58.97 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - Approval - AEMP - Submission Deferral - Mar30_22.pdf (786.7 KB) | ||
NATCL - Upcoming Updates - AEMP Design Plan, ICRP, BRP - Jan24_22.pdf (901.17 KB) | ||
NATCL - Deferral AMEP Design Plan - Staff Report and Comments - Jul2-20.pdf (765.86 KB) | ||
NATCL - Request to defer ubmission of AEMP Letter - Mar21-19.pdf (94.77 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - 2017 EEM Fifth Interpretive Report (Final) with Comment and Responses - Dec8_20.pdf (16.95 MB) | ||
NATCL - 2015 EEM Report - Apr21-16.pdf (8.45 MB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
NATCL - CM Plan V8 - Dec 22_23.pdf (4.46 MB) | ||
NATCL - Upcoming Updates for AEMP Design Plan, ICRP, BRP - Jan24_22.pdf (901.17 KB) | ||
NATCL - ICRP Deferral - Staff Report and Comments - Apr30-20.pdf (343.69 KB) | ||
NATCL - Approval - ICRP Submission Deferral - Apr30_20.pdf (755.02 KB) | ||
NATCL - Interim Closure and Reclamation Plan (ICRP) - Deferral Request - Mar4_20.pdf (356.36 KB) | ||
NATCL - Request for comments on Updated Care and Maintenance Plan - Sep18-17.pdf (346.79 KB) | ||
NATCL - Updated Care and Maintenance Plan - Sep5-17.pdf (2.4 MB) | ||
NATCL - Notice of Tailings Stability Assessment Submission - Jul19-17.pdf (80.34 KB) | ||
NATCL - SRK Tailings Facility Stability Assessment - Jul18_17.pdf (64.9 MB) |