Skip to main content

Canadian Zinc Corporation - MV2014F0013

​Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River. For non-federal portion of the road. 

This Permit is accompanied by Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002

Please Note: This Permit and associated Water Licence are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006

Uploaded On or After
Uploaded On or Before
Displaying 101 - 200 of 320
2. Initial/Renewal Application
Environmental Assessment
Document Received/Sent Uploaded
CZN - All-Season Road - Post-EA Information Pkg Required - Oct9-18.pdf (2.52 MB)
CZN - Staff Report - EA Referral for new applications - May22-14.pdf (740.62 KB)
CZN - Referral to Environmental Assessment - May22-14.pdf (45.09 KB)
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
CZN - New LUP Application - Further Studies Requested 22 2 b - Staff Report - Nov8-18.pdf (144.01 KB)
CZN - New LUP Application - Further Studies Required - Nov8-18.pdf (260.72 KB)
Preliminary Screening
Document Received/Sent Uploaded
CZN - Preliminary Screening Determination - Aug20_19.pdf (408.73 KB)
CZN - ASR - Preliminary Screening Determination - Staff Report and Comments - Aug8_19.pdf (1.79 MB)
CZN - Preliminary Screening Notification to Review Board - Aug9_19.pdf (386.39 KB)
Technical Session
Document Received/Sent Uploaded
CZN - ASR - Information Requests - Jun11-19.pdf (830.42 KB)
CZN - Tech Session Information Request Responses - Security (IR8) - Jul2-19.pdf (1.53 MB)
CNZ - Tech Session Information Request Responses - Technical Panel Appointees - Jun26-19.pdf (3.2 MB)
CZN - ASR - Proceeding - Tech Session Transcripts Available - Jun13-19.pdf (78.02 KB)
CZN - ASR - Technical Session Presentation - Jun5_19.pdf (2.87 MB)
CZN - Technical Session Presentation - Jun5-19.pdf (77.64 KB)
CZN - Notice of Technical Session Agenda - Jun3-19.pdf (309.76 KB)
CZN - Technical Session Agenda - Jun3-19.pdf (233.74 KB)
3. Amendment Application
Application and Related Docs
Document Received/Sent Uploaded
CZN - Quarry Permit Application - Aug10_ 20.pdf (754.09 KB)
CZN - ASR - Permit Conditions - Proposed Amendment - Jul13_22.docx (97.9 KB)
CZN - ASR - LUP - Amendment Request - Jun14_22.pdf (548.87 KB)
CZN - MVLWB Response to Amendment Application - Jul8-14.pdf (59.52 KB)
CZN - Amendment Application - Jun24-14.pdf (178.62 KB)
Preliminary Screening
Document Received/Sent Uploaded
CZN - ASR - Notification - Preliminary Screening Determination - Aug31_22.pdf (382.41 KB)
4. Permit Extension Request
Application and Related Docs
Document Received/Sent Uploaded
CZN – ASR – Approval - Extension to Term - Oct7_24.pdf (766.43 KB)
CZN - ASR - Permit Extension Request - Jul16_24.pdf (1.25 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
CZN – ASR – Extension to Term - Review Comment Table - Oct7_24.pdf (426.52 KB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - ASR - 2023 Annual Report - Mar 31_24.pdf (14.19 MB)
CZN - ASR – 2023 Annual Report - Review Comment Table - Jan30_25.pdf (839.8 KB)
CZN - ASR – 2023 Annual Report - Board Acknowledgement - Jan30_25.pdf (203.61 KB)
CZN - ASR - Correspondence that 2022 Annual Report not submitted - Nov30_23.pdf (159.77 KB)
CZN - Annual Report 2021 - Revised - Jul13_22.pdf (101.75 KB)
CZN - 2020 Annual Permit and Licence Report - Staff Report - Jun17_21.pdf (370.24 KB)
CZN - Acknowledgment - 2020 Annual Permit and Licence Report - Jun17-21.pdf (121.15 KB)
CZN - ASR - Letter Re Annual Report - Mar23_21.pdf (125.91 KB)
CZN - Annual Reports - Staff Report and Comments - Oct8_20.pdf (1.1 MB)
CZN - 2019 Annual Reports - Accepted - Oct9-20.pdf (191.39 KB)
Designs and As-Builts
Document Received/Sent Uploaded
CZN - ASR - Phase 2 - Mapbook - KM 103-170 - Nov16_23.pdf (11.69 MB)
CZN - ASR - Phase 2 - Mapbook - KM 0-103 - Nov16_23.pdf (13.92 MB)
CZN - ASR - Non-Typical Winter Road As-Built Drawings - Jul24_23.pdf (9.16 MB)
CZN - ASR - Winter Road Deactivation Drawings - Jul24_23.pdf (11.55 MB)
CZN - ASR - Memo Re Winter Road As-Built and Deactivation Drawings - Jul24_23.pdf (8.06 MB)
CZN - ASR - Phase 1 DCP V2.1 - Conformity Confirmation - Jan10_23.pdf (149.87 KB)
CZN - ASR - Phase 1 DCP V2.1 - Dec9_22.pdf (52.38 MB)
CZN - Acknowledgment - Design and Construction Plan v2 - Nov22_22.pdf (202.67 KB)
CZN - ASR - Phase 1 DCP V2 Appendix B - Nov8_22.pdf (50.96 MB)
CZN - ASR - Phase 1 DCP V2 Liard Ice Bridge Stamped - Nov8_22.pdf (8.06 MB)
CZN - ASR - Phase 1 DCP V2 - ITRP Letter - Nov8_22.pdf (168.58 KB)
CZN - ASR - Phase 1 DCP V2 - Nov8_22.pdf (55.79 MB)
CZN - ASR – Acknowledgement - Design and Construction Plan - Oct14_22.pdf (193.08 KB)
CZN - ASR - Winter Road Design and Construction Plan Updated - Aug22_22.pdf (46.83 MB)
CZN - ASR - DCP - ITRP Acceptance Letter for DCP - Aug22_22.pdf (694.04 KB)
CZN - DCP Phase 1 - Version 1 - Correspondence - Jan17_22.pdf (192.02 KB)
CZN - ITRP Acceptance Letter - Detailed Construction Plan - Jan17_22.pdf (676.53 KB)
Inspection Reports
Document Received/Sent Uploaded
CZN - ASR - Inspection Report - Apr30_24.pdf (6.55 MB)
CZN - ASR - Inspection Report - Nov22_23 - Dec12_23.pdf (1.71 MB)
CZN - ASR - Inspection Report - May10, 2023 - May26_23.pdf (10.03 MB)
CZN - ASR - Inspection Report - April 12, 2023 - Apr20_23.pdf (5.92 MB)
CZN - ASR - Inspection Report - March 27, 2023 - Apr6_23.pdf (3.44 MB)
CZN - Inspection Report - March 6, 2023 - Mar10_23.pdf (7.15 MB)
CZN - CIRNAC IAB Lands - Inspection Report - Jan18_23.pdf (873.32 KB)
CZN - ASR - Inspection Report - Jan17_23.pdf (1.15 MB)
CZN - ASR - Inspection Report - Dec12_22.pdf (1.83 MB)
CZN - Inspector Response - Inquiry to work under MV2014L8-0006 WL for construction of Ice Bridge - Nov24_21.pdf (145.98 KB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - ASR - Phase 1 Winter Road - Drilling Locations - Feb4_25.pdf (833.59 KB)
CZN - ASR - Winter Road Deactivation Plan - KP 0 to 17 - Mar30_23.pdf (3.85 MB)
CZN - ASR - Winter Road Deactivation Plan - Email Correspondence - Mar29_23.pdf (143.14 KB)
CZN - ASR - Winter Road Deactivation Plan - KP 101 to 169 - Mar30_23.pdf (3.82 MB)
CZN - ASR - Request to Change Annual Report Submision Date - Mar17_23.pdf (165.22 KB)
CZN - ASR - Construction Report - Nov19_22.pdf (8.97 MB)
CZN - ASR - Notification - Phase 1 Winter Road Commencement - Oct5_22.pdf (262.33 KB)
CZN - ASR - Notification of Commencemet Staging Area - Sep20_22.pdf (333.34 KB)
CZN - ASR - Letter re Revised Annual Report - Aug16_22.pdf (101.75 KB)
CZN - ASR - Request for Pioneer Winter Road Emergency Approval - Apr6_22.pdf (148.01 KB)
CZN - ASR - Re Pioneer Winter Road Request - Inspector Response - Apr5_22.pdf (199.01 KB)
CZN - ASR - Winter 2021-22 Construction Deferral - Dec20_21.pdf (282.32 KB)
CZN - Prairie Creek ASR - Correspondence - Nov17_21.pdf (122.65 KB)
Other
Document Received/Sent Uploaded
CZN - PWNHC AIA Winter Road Review Letter - April8-20.pdf (164.48 KB)
SNP Reports
Document Received/Sent Uploaded
CZN - ASR - SNP Reports - Response to Conformity Commentnts on 2022 and 2023 SNP Reports - Feb27_24.pdf (203.27 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
CZN - ASR – Invasive Species Management Plan V3 - Not Approved - Mar23_25.pdf (271.41 KB)
CZN - ASR – Explosives Management Plan V3.1 – Extension Request - Approved - Mar23_25.pdf (182.91 KB)
CZN - ASR – Invasive Species Management Plan V3 - Review Comment Table - Mar23_25.pdf (555.33 KB)
CZN - ASR - Explosives Managment Plan V3.1- Extension Request - Feb27_25.pdf (262.46 KB)
CZN - ASR - Traffic Plan V3.1 - Extension Request - Dec19_24.pdf (108.78 KB)
CZN – ASR – Traffic Plan Version 3 - Review Comment Table - Oct28_24.pdf (599.32 KB)
CZN – ASR – Traffic Plan Version 3 - Revisions Required - Oct28_24.pdf (233.3 KB)
CZN - ASR - Invasive Species Management Plan - V3.pdf (18.89 MB)
CZN - ASR - Invasive Species Management Plan - V3.0 Part 2 - Sept26_24.pdf (18.6 MB)
CZN - Rare Plant MP V3.pdf (149.59 KB)
CZN - ASR - Rare Plant Management Plan - V3.pdf (12.41 MB)
CZN - ASR - Cultural Heritage Protection Plan - V2.pdf (36.36 MB)
CZN - CHPP V2.pdf (149.86 KB)
CZN - ASR - Traffic Plan V3 - Apr30_24.pdf (4.59 MB)
CZN - ASR - Rare Plant Management Plans V3 - Request for Extension to Submission Date - Mar25_24.pdf (98.26 KB)
CZN - ASR - Cultural Heritage Plan V2 - Request for Extension to Submission Date - Mar25_24.pdf (98.26 KB)
CZN - ASR – Phase 2 - Explosives Management Plan – V3 - Not Approved - Mar19_24.pdf (239.32 KB)
CZN - ASR – Phase 2 - Explosives Management Plan – Version 3 - Review Comment Table - Mar19_24.pdf (576.14 KB)
CZN - ASR – Cultural Heritage Protection Plan V2 - Revisions Required - Mar8_24.pdf (220.16 KB)
CZN - ASR - Rare Plant Management Plan V3 - Revisions Required - Mar8_24.pdf (225.95 KB)
CZN - ASR – Cultural Heritage Protection Plan V2 - Review Comment Table - Mar6_24.pdf (560.28 KB)
CZN - ASR - Phase 2 - Rare Plant Management Plan V3 - Review Comment Table - Mar6_24.pdf (495.32 KB)
CZN - ASR - Phase 2 - Rare Plant Managment Plan V3 - Dec8_23.pdf (6.57 MB)