Canadian Zinc Corporation - MV2014F0013
Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River. For non-federal portion of the road.
This Permit is accompanied by Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002
Please Note: This Permit and associated Water Licence are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006
Documents
- All Issuances (13)
- Annual Reports (7)
- Application and Related Docs (67)
- Assorted Management Plans (85)
- Conceptual Closure and Reclamation Plan (17)
- Consultations - Reviews - Work Plans (22)
- Designs and As-Builts (17)
- Engagement Plan (9)
- Environmental Assessment (6)
- Further Study Requested Sec. 22.2.b (2)
- Inspection Reports (10)
- Operations and Notifications (12)
- Other (1)
- Other Monitoring Program (3)
- Preliminary Screening (4)
- Security and Water Use Fees (3)
- Sediment and Erosion Control (7)
- Shapefiles (1)
- SNP Reports (1)
- Spill - Contingency - Emergency Response (2)
- Technical Session (8)
- Waste Management Plan (6)
- WEMP - Wildlife Effects Monitoring Program (7)
Document | Received/Sent | Uploaded |
---|---|---|
CZN - All-Season Road - Post-EA Information Pkg Required - Oct9-18.pdf (2.52 MB) | ||
CZN - Staff Report - EA Referral for new applications - May22-14.pdf (740.62 KB) | ||
CZN - Referral to Environmental Assessment - May22-14.pdf (45.09 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - New LUP Application - Further Studies Requested 22 2 b - Staff Report - Nov8-18.pdf (144.01 KB) | ||
CZN - New LUP Application - Further Studies Required - Nov8-18.pdf (260.72 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Preliminary Screening Determination - Aug20_19.pdf (408.73 KB) | ||
CZN - All Season Road - Preliminary Screening Determination - Staff Report and Comments - Aug8_19.pdf (1.79 MB) | ||
CZN - Preliminary Screening Notification to Review Board - Aug9_19.pdf (386.39 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Prairie Creek - Information Requests - Jun11-19.pdf (830.42 KB) | ||
CZN - Tech Session Information Request Responses - Security (IR8) - Jul2-19.pdf (1.53 MB) | ||
CNZ - Tech Session Information Request Responses - Technical Panel Appointees - Jun26-19.pdf (3.2 MB) | ||
CZN - All-Season Road Project Proceeding - Tech Session Transcripts Available - Jun13-19.pdf (78.02 KB) | ||
CZN - All Season Road Technical Session Presentation - Jun5_19.pdf (2.87 MB) | ||
CZN - Technical Session Presentation - Jun5-19.pdf (77.64 KB) | ||
CZN - Notice of Technical Session Agenda - Jun3-19.pdf (309.76 KB) | ||
CZN - Technical Session Agenda - Jun3-19.pdf (233.74 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Quarry Permit Application - Aug10_ 2022.pdf (754.09 KB) | ||
CZN - Prairie Creek ASR - Permit Conditions - Proposed Amendment - Jul13_22.docx (97.9 KB) | ||
CZN -ASR-LUP - Amendment Request - Jun14_22.pdf (548.87 KB) | ||
CZN - MVLWB Response to Amendment Application - Jul8-14.pdf (59.52 KB) | ||
CZN - Amendment Application - Jun24-14.pdf (178.62 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Notification - Preliminary Screening Determination - Aug31_22.pdf (382.41 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – ASR – Approval - Extension to Term - Oct7_24.pdf (766.43 KB) | ||
CZN - ASR - Permit Extension Request - Jul16_24.pdf (1.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – ASR – Extension to Term - Review Comment Table - Oct7_24.pdf (426.52 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Correspondence that 2022 Annual Report not submitted - Nov30_23.pdf (159.77 KB) | ||
CZN - Annual Report 2021 - Revised - Jul13_22.pdf (101.75 KB) | ||
CZN - 2020 Annual Permit and Licence Report - Staff Report - Jun17_21.pdf (370.24 KB) | ||
CZN - Acknowledgment - 2020 Annual Permit and Licence Report - Jun17-21.pdf (121.15 KB) | ||
CZN - All Season Road Project - Letter Re Annual Report - Mar23_21.pdf (125.91 KB) | ||
CZN - Annual Reports - Staff Report and Comments - Oct8_20.pdf (1.1 MB) | ||
CZN - 2019 Annual Reports - Accepted - Oct9-20.pdf (191.39 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Inspection Report - Apr30_24.pdf (6.55 MB) | ||
CZN - ASR - Inspection Report - Nov22_2023 - Dec12_2023.pdf (1.71 MB) | ||
CZN - ASR - Inspection Report - May10, 2023 - May 26_23.pdf (10.03 MB) | ||
CZN - ASR - Inspection Report - April 12, 2023 - Apr20_23.pdf (5.92 MB) | ||
CZN - ASR - Inspection Report - March 27, 2023 - Apr6_23.pdf (3.44 MB) | ||
CZN - Inspection Report - March 6, 2023 - Mar10_23.pdf (7.15 MB) | ||
CZN - CIRNAC IAB Lands - Inspection Report - Jan18_23.pdf (873.32 KB) | ||
CZN - ASR - Inspection Report - Jan17_23.pdf (1.15 MB) | ||
CZN - ASR - Inspection Report - Dec12_22.pdf (1.83 MB) | ||
CZN - Inspector Response - Inquiry to work under MV2014L8-0006 WL for construction of Ice Bridge - Nov24_21.pdf (145.98 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - PWNHC AIA Winter Road Review Letter - April8-20.pdf (164.48 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - SNP Reports - Response to Conformity Commentnts on 2022 and 2023 SNP Reports - Feb27_24.pdf (203.27 KB) |