Enbridge Pipelines (NW) Inc. - MV2013X0018
Status:
Closed
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
October 9, 2013
Expiry:
October 8, 2018
Staff:
Angela Love
Enbridge has applied for a LUP for use of land for the purpose of off-right of way remediation and reclamation at the KP 380.4 Willow Lake River release site. In 2011, off-right of way activities at the release site were authorized under Section 17 of the Mackenzie Valley Land Use Regulations as part of the emergency land use operation carried out in response to the Willowlake River KP380.4 pipeline leak. A Reclamation Plan for the site was approved by the National Energy Board in April 2012 and reclamation of this area is ongoing.
Displaying 1 - 13 of 13
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
MV2013X0018 - Enbridge Pipelines NW Inc - Final Clearance Letter - Dec10-18.pdf (276.48 KB) | ||
MV2013X0018 - Enbridge - Issuance letter with permit and conditions - Oct10-13.pdf (906.38 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2013X0018 - Enbridge - Jan-Dec 2014 Feild Modification requests for same area - Jan21-15.pdf (137.82 KB) | ||
MV2013X0018 - Enbridge Pipelines - Request for additional workspace- Authorization Letter - GNWT Lands - Jan9-15.pdf (67.38 KB) | ||
MV2013X0018 - Enbridge - Request for additional workspace - Dec18-14.pdf (274.11 KB) | ||
MV2013X0018 - Enbridge - Revised temporary land use request - Jan23-14.pdf (143.11 KB) | ||
MV2013X0018 - Enbridge - AANDC Authorization of temporary land use - Jan23-14.pdf (140.29 KB) | ||
MV2013X0018 - Enbridge - Temporary Land use request - Jan22-14.pdf (30.19 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2013X0018 - Enbridge Pipelines NW Inc - Final Clearance - Staff Report - Dec10-18.pdf (120.46 KB) | ||
MV2013X0018 - Enbridge - Closure Recommendation Letter from Inspector - Nov 2_18.pdf (319.31 KB) | ||
MV2013X0018 - Enbridge - Final Reclamation Report - Aug 29_18.pdf (39.8 MB) | ||
MV2013X0018 - Enbridge - Final Plan Cover Letter - Aug 29_18.pdf (1.17 MB) | ||
MV2013X0018 - Enbridge Pipelines NW - Request for final plan submission - Jul25-18.pdf (127.51 KB) |