Skip to main content

Enbridge Pipelines (NW) Inc. - MV2012X0024

Enbridge is applying for a land use permit to carry out erosion protection activities on and around Hodgson Creek, near where the creek crosses Enbridge’s Line 21 pipeline at KP 305. The site is approximately ten kilometers northeast of Wrigley, NT. The project proposes maintenance of existing erosion protection works, installation of vanes at, and upstream, of the existing erosion protection, and some additional erosion mitigation structures. There is an existing access off of the pipeline ROW that will be used to access the site. Equipment and materials storage will be on the pipeline ROW. The construction period is proposed as January 2013 to March 2013. Enbridge also plans to access the Mount Gaudet quarry to obtain granular material required to complete this work. A Quarry Permit from Aboriginal Affairs and Northern Development Canada will be obtained as required. Quarried material, crew, and all equipment will be transported to the project site using existing roads, accesses, and the pipeline right-of-way.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 35 of 35
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2012X0024 - Enbridge Pipelines - Final Clearance - Staff report - Apr12-18.pdf (177.75 KB)
MV2012X0024 - Enbridge Pipelines - Final Clearance Approval Letter - Apr12-18.pdf (384.89 KB)
MV2012X0024 - Enbridge - Issuance Letter with Conditions - Dec19-12.pdf (1.42 MB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2012X0024 - Enbridge Pipelines - Inspector Recommendation for File Closure- March 20_18.pdf (293.25 KB)
MV2012X0024 - Enbridge - Clarification from Enbridge on Final Plan - Dec 20_17.pdf (118.68 KB)
MV2012X0024 - Enbridge - Final Plan submission - Nov21-17.pdf (4.7 MB)
MV2012X0024 - Enbridge Piplines - Request for final inspection - Nov21-17.pdf (130.92 KB)
MV2012X0024 - Enbridge Pipelines (NW) Inc - Request for final plan - Nov7-17.pdf (290.57 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
MV2012X0024 - Enbridge - LUP Application Fee - Nov6-12.pdf (114.52 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2012L1-0006 and MV2012X0024 - Enbridge - Staff Report for New WL and LUP Application - Dec12-12.pdf (2.02 MB)
MV2012X0024 and MV2012L1-0006 - Enbridge - Updates for Construction start date - Dec14-12.pdf (432.03 KB)
MV2012X0024 - Enbridge LUP application complete - Nov15-12.pdf (140.21 KB)
MV2012X0024 - Enbridge - New WL Application - Erosion protection works plan - Nov6-12.pdf (6.03 MB)
MV2012X0024 - Enbridge - New WL Application - Spill Contingency Plan - Nov6-12.pdf (1.85 MB)
MV2012X0024 - Enbridge - New WL Application - Environmental MGMT Plan - Nov6-12.pdf (2.52 MB)
MV2012X0024 - Enbridge - New LUP Application - Nov6-12.pdf (7.26 MB)
MV2012X0024 - Enbridge - New WL Application - Waste MGMT Plan - Nov6-12.pdf (537.91 KB)
MV2012X0024 - Enbridge - NEW WL Application - Aquatic Environmental Assessment - Nov6-12.pdf (6.92 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2012L1-0006 and MV2012X0024 - Enbridge - Extension granted for response to reviewer comments - Apr8-13.pdf (50.67 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge Response to Reviewer Comments - Dec11-12.pdf (475.59 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Comments on Draft terms and conditions - Enbridge - Dec6-12.pdf (228.62 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - no comments on applications - ENR - Dec6-12.pdf (125.9 KB)
MV2012X0024 and MV2012L1-0006 - Enbridge - Comment on application - EC - Dec6-12.pdf (519.5 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Comments on Application - PKFN - Dec6-12.pdf (125 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Comments on Application - GNWT - DOT - Dec5-12.pdf (228.65 KB)
MV2012X0024 - Enbridge - No comment on application - AANDC - Dec5-12.pdf (117.92 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - No Comment on Application - AANDC - Dec4-12.pdf (111.38 KB)
MV2012X0024 - Enbridge - Request for comments on application - Nov16-12.pdf (530.59 KB)
Preliminary Screening
Document Received/Sent Uploaded
MV2012L1-0006 and MV2012X0024 - Enbridge - Preliminary Screening Report - Dec19-12.pdf (493.88 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2012X0024 - Enbridge Pipelines - Inspection Report for August 8 2017 - GNWT Lands - Sept18-17.pdf (721.12 KB)
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2012L1-0006 and MV2012X0024 - Enbridge - Update on timeline for revision of SCP - Jun20-13.pdf (99.1 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Revised comment on SCP - AANDC - Mar28-13.pdf (225.59 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - No comment on SCP - EC - Mar28-13.pdf (26.03 KB)
MV2012X0024 - Enbridge - Revised Spill Contingency Plan - Mar1-13.pdf (2.14 MB)
9. GIS Data
Shapefiles
Document Received/Sent Uploaded
MV2012X0024 - Enbridge - GIS data for LUP application - Oct30-12.zip (9.65 KB)