Skip to main content

Strategic Oil and Gas Ltd. - MV2010L1-0014

Paramount is porposing to construct Project H-72, which consists of a well site and associated well site access and pipleine right of way. Water will be withdrawn from water sources 1 through 4 and/or watercourses. Grey and blackwater and well casing cement will be deposited.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2010L1-0014 - 2010 Annual Report - Revised - Jun03-11.pdf (545.44 KB)
MV2010L1-0014 - 2010 Annual Report - May24-11.pdf (1.27 MB)