To access the existing wellsite (from June to September 2010) using the original route after various improvements have been implemented prior to use. Application includes access, camp sites, airstrip and lease would be the same as during the original wellsite work. Additionally, CFO is proposing to use existing quarries to retreive material for the barge landing site, stabilization of watercourse crossings, the camps site and well site.
This file is expired but not closed as not all sites have been carried over to new authorizations. Refer also to MV2003A0005 and MV2010A0016 and MV2018X0002.