Skip to main content

Northwest Territories Power Corporation - MV2009X0040

Bluefish Power Generating Facility: construction of a new primary impoundment dam.
 Accompanied by Licence MV2009L4-0004.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 19 of 19
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
MV2009X0040- Request for Comments- Nov16-10.pdf (329.15 KB)
Inspection Reports
Document Received/Sent Uploaded
MV2009X0040- NTPC - Environmental Inspection Report for November 14, 2012 Nov28-12- .pdf (1.11 MB)
MV2009X0040 - NTPC - Inspection Report - Sept11-12.pdf (2 MB)
MV2009X0040 - NTPC - July 17 2012 Inspection Report - Jul18-12.pdf (2.09 MB)
MV2009X0040 - Inspection Report for April 26-12 - May4-12.pdf (1.5 MB)
MV2009X0040 - March 21 2012 Inspection Report - Mar21-12.pdf (1.81 MB)
MV2009X0040- Inspection Report- Oct13-11.pdf (1.23 MB)
MV2009X0040- Sept 6-11 Inspection Report- Sept6-11.pdf (416.51 KB)
MV2009X0040 - Inspection Report - Jun30-11.pdf (1.23 MB)
MV2009X0040 - Inspection Report - May17-11.pdf (1.35 MB)
MV2009X0040 - Inspection Report - Apr20-11.pdf (1.62 MB)
Operations and Notifications
Document Received/Sent Uploaded
MV2009X0040 - Initiation of In-Water Works -Aug28-12.pdf (860.86 KB)
Other
Document Received/Sent Uploaded
MV2009X0040- Comment on Mercury Study- DFO- Oct28-11.pdf (194.35 KB)
MV2009X0040- Comment on Mercury Special Effects Study- EC- Oct27-11.pdf (386.17 KB)
MV2009X0040 - MV2009L4-0004 - Request for Dam Construction Plans - Oct 5-09.pdf (78.53 KB)
MV2009X0040 - 2005 Dam Safety Appendix E - F - Sept2-09.pdf (8.04 MB)
MV2009X0040 - 2005 Dam Safety Report - Sept2-09.pdf (9.31 MB)
MV2009X0040 - 2005 Dam Safety - Appendix A - D - Sept2-09.pdf (5.15 MB)
MV2009L4-0004 - MV2009X0040 - Bluefish Hydro Emergency Preparedness Plan 08 -3.pdf (583.85 KB)