Skip to main content

Rowes Construction - MV2008Q0035

The extraction of gravel for current GNWT supply contract.  Quarry operation.  The material will be stockpiled for the GNWT to use initially.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2008Q0035 - Rowes Construction - August 17 2015 Inspection Report - GNWT Lands - Aug21-15.pdf (219.45 KB)
MV2008Q0035 - Rowes Construction - May 11 2015 Inspection Report - GNWT Lands - Jun8-15.pdf (321.06 KB)
MV2008Q0035 - Rowes Construction - September 22 2014 Inspection Report - GNWT Lands - Nov24-14.pdf (313.69 KB)
MV2008Q0035 - Rowes Construction - October 12 2012 Inpsection Report - Nov2-12.pdf (118.46 KB)
MV2008Q0035 - Inspection Report - Jul16-10.pdf (759.52 KB)
MV2008Q0035 - Inspection Report - Oct 7-09.pdf (785.62 KB)
MV2008Q0035 - Inspection Report - INAC - Mar17-09.pdf (201.18 KB)