Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Assorted Management Plans
Document Received/Sent Uploaded
2006C0014 - MV2006L2-0003 - PINE POINT FINAL REPORT - May-06.pdf (43.79 MB)
Inspection Reports
Document Received/Sent Uploaded
MV2006C0014 - Tamerlane Ventures - October 21 2014 Inspection and closure recommendation - GNWT Lands - Nov20-14.pdf (127.5 KB)
MV2006C0014 - Inspection Report - Apr30-10.pdf (155.56 KB)
Other
Document Received/Sent Uploaded
MV06C14-MV06L2-03-fax-EIRB-DescriptionReport-Sep1-06.pdf (3.55 MB)