Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
4. Permit Extension Request
Application and Related Docs
Document Received/Sent Uploaded
MV2006C0014 - Incomplete Application - Mining Questionnaire - Mar08-11.pdf (88.81 KB)
MV2006C0014 - LUP Renewal Application Incomplete - Mar03-11.pdf (300.59 KB)