Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
1. Permit - Licence - Other Issuances
Security and Water Use Fees
Document Received/Sent Uploaded
MV06C14 Preliminary Screening Comments INAC Jun27-08.pdf (211.51 KB)