Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
Other
Document Received/Sent Uploaded
MV2006C0014 - Company Address Change - Aug26-11.pdf (63.44 KB)
5. Reports and Studies
Other
Document Received/Sent Uploaded
MV06C14-MV06L2-03-fax-EIRB-DescriptionReport-Sep1-06.pdf (3.55 MB)