Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
8. Closure and Reclamation
Interim Closure and Reclamation Plan
Document Received/Sent Uploaded
MV06C14 Conceptual Closure and Reclamation Plan for Review July28-08.pdf (2.64 MB)
MV06C14 Closure and Reclamation Plan July15-08.pdf (4.83 MB)