Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
1. Permit - Licence - Other Issuances
Final Plan and Clearance
Document Received/Sent Uploaded
MV2006C0014 - Tamerlane Ventures Inc - Staff Report - Final Clearance - Jul16-15.pdf (178.86 KB)
MV2006C0014 - Tamerlane Ventures Inc - Final Clearance Letter - Jul16-15.pdf (133.3 KB)
MV2006C0014 - Tamerlane Ventures - Request for final plan - Oct22-12.pdf (136.66 KB)