Skip to main content

Tamerlane Ventures Inc. - MV2006C0014

Proposed Pb/Zn pilot plant. The PPPP (Pine Point Pilot Project) will confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
2. Initial/Renewal Application
Environmental Assessment
Document Received/Sent Uploaded
MV06C14 EA0607-002 Complete -No EIR required May.13-08.pdf (54.84 KB)
MV2006C0014 - Referral to Environmental Assessment - Jun29-06.pdf (244.14 KB)