Imperial Oil Resources Ventures Ltd. - MV2003X0045
Status:
Withdrawn
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
Expiry:
Staff:
Angela Love
winter field geotechnical investigation program to assess the construction and engineering feasibility of a Mackenzie Valley pipeline system
After a public process in early 2016, both the NEB and OROGO extended the sunset clause to December 31, 2022.
After a public process in early 2016, both the NEB and OROGO extended the sunset clause to December 31, 2022.
Displaying 1 - 59 of 59
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
Imperial Oil - Final EA Decision - Geotechnical Program - Oct28-09.pdf (670.76 KB) | ||
Imperial Oil - create link to EA03-009 on MVEIRB site_or post all docs.txt (0 bytes) | ||
Imperial Oil - Regarding EA - Consult to Modify-Jun3-05.pdf (1.11 MB) | ||
Imperial Oil - Response to SKDB - MVEIRB - Mar03-04.pdf (3.91 MB) | ||
Imperial Oil - Fax - Imperial Oil - PKFN Referral - Feb20-04.pdf (200.77 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
Imperial Oil – Withdrawal of Applications - Mar6_23.pdf (172.91 KB) |