Skip to main content

BHP Billiton Canada Inc. - MV2001X0072

Ekati Mine - support development and mining activities at the Pigeon kimberlite pipe.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
Other
Document Received/Sent Uploaded
Application.pdf (5.01 MB)
Prelim Screening.pdf (376.89 KB)
MV2001X0072-Ltr-SecureDeposit-Jan05.pdf (97.03 KB)
xxMV2001X0072-EM-PigeonSec-Jan05.pdf (66.14 KB)
MV2001X0072-Ltr-SecDep-Feb05.pdf (253.21 KB)
MV2001X0072-LtrofCredit-Mar05.pdf (63.75 KB)
MV2001X0072-EM-NotDrilActPigeonStream-Jan05.pdf (364.45 KB)
MV01X72-EM-06-07PigeonWinterDrillingProgram-Oct06.pdf (43.39 KB)
MV2001X0072 Permit.pdf (640.6 KB)
BHP-Ltr-AcknowledgeLtrFeb15-06-AssumesLicensingAndPermittingResponsibilities-Mar06.pdf (57.12 KB)
MV03L2-13-MV01L2-08-MV01X72-InspRpt-May30And31-07.pdf (2.51 MB)
MV02C40-MV01X72-InspRpt-Apr24-07.pdf (2.53 MB)
MV01X71-MV01X72-SRpts-ExtnReqs-TypeA-May07.pdf (1.16 MB)
MV01X71-MV01X72-MV02C40-ExtnReq-LtrApr19-07-May07.pdf (197.83 KB)
MV01X71-MV01X72-MV02C40-ExtnReqApr-Dist-May07.pdf (1.89 MB)
5. Reports and Studies
Other
Document Received/Sent Uploaded
MV2001X0072 - INAC and BHP Correspondence - Pigeon Pipe Bulk Sampling Program - Jul24 09.pdf (14.69 KB)