BHP Billiton Canada Inc. - MV2001L2-0008
- All maps from Natural Resources Canada
200 km
Status:
Closed
Authorization:
Licence
Activity:
Mining and Milling
Start:
August 14, 2002
Expiry:
August 13, 2009
Staff:
NA
mining development of Beartooth pipe, pigeon pipe and sable pipe
Displaying 1 - 81 of 81
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
MV2001L2-0008 - BHP Billiton - 2007 EA and WL Annual Report - Apr 30 08.pdf (1.77 MB) | ||
MV2001L2-0008 - 2005 Environmental Workshop - Recommendations from IEMA - Apr08 05.pdf (236.2 KB) | ||
MV2001L2-0008 - 2006 Annual Report - Apr 06.pdf (2.14 MB) | ||
MV2001L2-0008 - 2005 Annual Report - Jul 06.pdf (1.79 MB) | ||
MV2001L2-0008 - 2004 Annual Report - May 05.pdf (1.92 MB) | ||
AllWLFiles- 04 Annual Report Extended to Apr30-05 - Mar24-05.pdf (310.74 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2001L2-0008 - Prelim. Design of Water Control Structures - Sable, Pigeon, and Beartooth Pit Developments - Aug22-01.pdf (8.89 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2001L2-0008 - Notification of Updated Beartooth Pit Design - May20 05.pdf (637.33 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2001L2-0008 - Central Balance Tank - BHP Letter to INAC - May23 08.pdf (74.96 KB) | ||
MV2001L2-0008 - Minor Changes to Spill Reporting - Jan11 05.pdf (136.9 KB) | ||
MV2001L2-0008 - Water Collection System Clarification - Apr05.pdf (16.68 KB) | ||
MV2001L2-0008 - Notification of Commencement of Pumping - Bearclaw Lake and Desperation Pond - Jun01 07.pdf (1.26 MB) | ||
N7L2-1616-MV2001L2-0008-FileNote-NiskinSamplers-May05.pdf (278.23 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2001L2-0008 - BHP - Surveillance Network Program Section D Part Six - Jan 9_03.pdf (50.44 KB) |