Skip to main content

EGT Northwind Ltd. - G19S011

A geotechnical program will be conducted using a track-mounted geotechnical auger drill rig. The project is plan is for 12 boreholes to be advanced to 10m (3 holes), 15m (8holes), and 30m (1 hole) or refusal.  Minimal vegetation will be cleared to allow the geotechnical drill to move from site to site. No camp will be required for this project. 
Uploaded On or After
Uploaded On or Before
Displaying 1 - 14 of 14
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
G19S011 - Land Use Permit - Jan27_20.pdf (288.42 KB)
G19S011 - Permit Issuance Letter - Jan27_20.pdf (31.91 KB)
G19S011 - Reasons for Decision - Jan27_20.pdf (208.09 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
G19S011 - Request for Comments - Geotechnical km 230 - Dec16_19.pdf (144.62 KB)
G19S011 - DRAFT Land Use Permit - Dec16_19.pdf (208.73 KB)
G19S011 - Application Package - Dec13_19.pdf (7.71 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
G19S011 - GTC Department of Cultural Heritage Late Comments - Jan13_20.pdf (522.76 KB)
G19S011 - Review Comments Summary table - Jan16_19.pdf (121.49 KB)
G19S011 - ENR Comments - Jan07_20.pdf (325.51 KB)
Preliminary Screening
Document Received/Sent Uploaded
G19S011 - Notification of Preliminary Screening Determination - Jan16_20.pdf (29.47 KB)
G19S011 - Preliminary Screening Report - Jan16_20.pdf (591.31 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
G19S011 - GNWT Lands Inspection Report - Apr29_20.pdf (913.65 KB)
G19S011 - GNWT Lands Inspection -Mar05_20.pdf (1.78 MB)
G19S011 - GNWT Lands Inspection - Feb27_20.pdf (2.28 MB)