CIRNAC-CARD - S17D-003
Status:
Expired
Authorization:
Land Use Permit
Activity:
Mining Exploration - Mine Shaft
Start:
July 25, 2017
Expiry:
July 24, 2022
Staff:
Bonnie Bergsma
The renewal of Permit S09D-001 for the Great Bear Lake Remediation project encompassing Silver Bear Mines (including Terra, Northrim, Norex, Graham Vein and Smallwood Mines), El Bonanza Mines (including El Bonanza and Bonanza), Contact Lake Mine and Sawmill Bay Mine. The remediation project will restore these abandoned sites to their original state as much as possible. Associated Water Licence is S17L8-002 (renewal of S15L8-001, S09L8-001 original issuance).
- All Issuances (3)
- Application and Related Docs (17)
- Assorted Management Plans (10)
- Consultations - Reviews - Work Plans (7)
- Designs and As-Builts (6)
- Engagement Plan (1)
- Final Plan and Clearance (1)
- Other (2)
- Other Monitoring Program (1)
- Shapefiles (1)
- Spill - Contingency - Emergency Response (1)
- Waste Management Plan (1)
Documents
Displaying 1 - 51 of 51
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - INAC-CARD - Land Use Permit - Jul 13_17.pdf (312.22 KB) | July 13, 2017 | July 17, 2017 |
S17D-003 - INAC-CARD - Issuance Letter - Jul 13_17.pdf (55.09 KB) | July 13, 2017 | July 17, 2017 |
S17D-003 - INAC-CARD - Reasons for Decision - Jul 13_17.pdf (53.66 KB) | July 13, 2017 | July 17, 2017 |
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - CIRNAC-CARD - In Preparation for Expiry - May17_22.pdf (213.01 KB) | July 21, 2022 | July 21, 2022 |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - INAC-CARD - Review Comment Table Final - Jul 13_17.pdf (641.24 KB) | July 13, 2017 | July 17, 2017 |
S17L8-002 - S17D-003 - Application Deemed Complete - Jun 1_17.pdf (372.9 KB) | June 1, 2017 | July 12, 2017 |
S17D-003 - KBL Hazardous Waste Acceptance - Jun 23_17.pdf (211.75 KB) | June 23, 2017 | June 29, 2017 |
S17D-003 - Letter of Support from Deline - Jun 15_17.pdf (51.64 KB) | June 15, 2017 | June 22, 2017 |
S17LD-003 - Acceptance of Waste from Yellowknife - Jun 12_17.pdf (89.44 KB) | June 12, 2017 | June 22, 2017 |
4. Permit Extension Request
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - CIRNAC- CARD - Land Use Permit Extension - Dec 13_22.pdf (737.87 KB) | December 13, 2022 | December 13, 2022 |
S17D-003 - Engagement for Extension - CIRNAC-CARD - Dec 7_22.pdf (3.03 MB) | December 7, 2022 | December 7, 2022 |
S17D-003 - CIRNAC-CARD - Extension Request Submission Package - Nov 9_2022.pdf (299.27 KB) | November 9, 2022 | November 9, 2022 |
S17D-003 - CIRNAC-CARD - Engagement - Land Use Permit Extension Consensus Deline - Nov8_22.pdf (107.74 KB) | November 8, 2022 | November 9, 2022 |
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - CIRNAC-CARD - Staff Report - Extension - Dec 7_22.pdf (3.48 MB) | December 7, 2022 | December 7, 2022 |
S17D-003 - Review Comments for Extension - Dec 7_22.pdf (172.48 KB) | December 7, 2022 | December 7, 2022 |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Appendix E1 - Detail Design Drawings - May 26_17.PDF (9.46 MB) | May 26, 2017 | May 30, 2017 |
S17D-003 - GBL LUP - Appendix E2 - Detail Design Drawings - May 26_17.PDF (8.44 MB) | May 26, 2017 | May 30, 2017 |
S17D-003 - GBL LUP - Appendix E3 - Detail Design Drawings - May 26_17.PDF (9.75 MB) | May 26, 2017 | May 30, 2017 |
S17D-003 - GBL LUP - Appendix E4 - Detail Design Drawings - May 26_17.PDF (9.5 MB) | May 26, 2017 | May 30, 2017 |
S17D-003 - GBL LUP - Appendix E6 - Detail Design Drawings - May 26_17.PDF (3.51 MB) | May 26, 2017 | May 30, 2017 |
S17D-003 - GBL LUP - Appendix E5 - Detail Design Drawings - May 26_17.PDF (9.23 MB) | May 26, 2017 | May 30, 2017 |
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Appendix K - List of Reports and Studies - May 26_17.PDF (90.88 KB) | May 26, 2017 | May 30, 2017 |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Appendix F - Engagement Plan and Log - May 26_17.PDF (2.03 MB) | May 26, 2017 | May 30, 2017 |
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Appendix I - Wildlife Management Plan - May 26_17.PDF (303.11 KB) | May 26, 2017 | May 30, 2017 |
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Appendix G - Spill Contingency Plan - May 26_17.PDF (4.55 MB) | May 26, 2017 | May 30, 2017 |
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Appendix H - Waste Management Plan - May 26_17.PDF (309.42 KB) | May 26, 2017 | May 30, 2017 |
7. Monitoring Programs
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - Annex A8 - Proposed Long Term Status of Environmental and Construction Monitoring Plans - May 26_17.PDF (1.74 MB) | May 26, 2017 | May 30, 2017 |
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
S17D-003 - GBL LUP - GIS Data - May 26_17.zip (68.49 KB) | May 26, 2017 | June 2, 2017 |