Enbridge Pipelines (NW) Inc. - S20P-003

​Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.

Documents

Displaying 1 - 19 of 19
Uploaded On or After
Uploaded On or Before
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S20P-003 - Application Project Contact List - Jan 11_21.pdf (90.43 KB) January 15, 2021 January 15, 2021
S20P-003 - Drill Locations Map - Line 21 KP 158 Pipe Replacement at Little Smith Creek - Dec 11_20.pdf (1.72 MB) December 11, 2020 December 11, 2020
S20P-003 - Letter to SLWB re Drill Locations Map - Dec 11_20.pdf (22.41 KB) December 11, 2020 December 11, 2020
S20P-003 - Cover Letter to SLWB re Revised Appendices - Sep 10_20.pdf (121.77 KB) September 10, 2020 September 10, 2020
S20P-003 - Environmental and Socio-Economic Assessment - Version 1.1 - Sep 10_20.pdf (31.27 MB) September 10, 2020 September 10, 2020
S20P-003 - Draft Land Use Permit Conditions - Jul 22_20.pdf (649.21 KB) July 23, 2020 July 23, 2020
S20P-003 - Revised Type A Permit Application - Line 21 at KP158 - Jul 17_20.pdf (318.05 KB) July 17, 2020 July 22, 2020
S20P-003 - Appendix 3 - Revised Environmental and Socio-Economic Assessment - Jul 17_20.pdf (33.6 MB) July 17, 2020 July 22, 2020
S20P-003 - Type A Permit Application -Line 21 at KP158 - Jun 30_20.pdf (316.44 KB) June 30, 2020 July 6, 2020
S20P-003 - Land Use Permit Cheque - Jun 30_20.pdf (681.49 KB) June 30, 2020 July 6, 2020
S20P-003 - Appendix 1 - Certificate of Corporation - Jun 30_20.pdf (830.23 KB) June 30, 2020 July 6, 2020
S20P-003 - Appendix 3 - Environmental And Socio-Economic Assessment - Jun 30_20.pdf (50.79 MB) June 30, 2020 July 6, 2020
S20P-003 - Appendix 7 - Equipment List - Jun 30_20.pdf (822.42 KB) June 30, 2020 July 6, 2020
S20P-003 - Appendix 9 - Closure Cost Estimate - Jun 30_20.pdf (30.22 KB) June 30, 2020 July 6, 2020
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S20P-003 - Enbridge EPP v. 1.1 - Staff Report - Dec 22_20.pdf (800.51 KB) December 23, 2020 December 23, 2020
S20P-003 -Enbridge Line 21 Replacement - KP158 - Staff Report - Aug 28 - Sep 17_20.pdf (2.88 MB) September 17, 2020 September 17, 2020
S20P-004 -Enbridge Line 21 Review Comment Table and attached correspondence - Sep 17_20.pdf (1.52 MB) September 14, 2020 September 14, 2020
S20P-003 - Enbridge Line 21 Pipeline Replacement Project - Staff Report - Aug -27_20.pdf.pdf (5.35 MB) August 28, 2020 August 28, 2020
Preliminary Screening
Document Received/Sent Uploaded
S20P-003 - Enbridge Line 21 - Preliminary Screening RFD - Aug 28_20.pdf (3.91 MB) August 28, 2020 August 28, 2020