Enbridge Pipelines (NW) Inc. - S20P-003
Status:
Issued
Authorization:
Land Use Permit
Activity:
Pipeline (P)
Start:
September 17, 2020
Expiry:
September 16, 2025
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.
Documents
Displaying 1 - 2 of 2
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Closure and Reclamation Plan - Version 1.1 -Sep 10_20.pdf (5.69 MB) | September 10, 2020 | September 10, 2020 |
S20P-003 - Appendix 5 - Closure and Reclamation Plan - Jun 30_20.pdf (6.51 MB) | June 30, 2020 | July 6, 2020 |