Enbridge Pipelines (NW) Inc. - S20P-003
Status:
Issued
Authorization:
Land Use Permit
Activity:
Pipeline
Start:
September 17, 2020
Expiry:
September 16, 2025
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.
Documents
Displaying 1 - 2 of 2
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Annual Water Licence Report - Mar 31_21.pdf (830.93 KB) | March 31, 2021 | March 31, 2021 |
S20P-003 - Annual Report Cover Letter - Mar 31_21.pdf (92.18 KB) | March 31, 2021 | March 31, 2021 |