Skip to main content

Cenovus Energy Inc. - S12X-006

Type A Land Use Permit Application by Husky Oil Operations Ltd. for a Groundwater investigation program.  Husky will be drilling twenty shallow wells to a maximum depth of thirty metres or three metres into the top of the bedrock.  The information collected will be used to assess the baseline water quality in shallow surficial and deep bedrock aquifers and to assess potential bedrock aquifers as a source of water to support future operations in the area.
Click here to see map​
Uploaded On or After
Uploaded On or Before
Displaying 1 - 100 of 116
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
Cenovus - Name Change - Acknowledgement Letter. - 2022.pdf (167 KB)
S12X-006 - Cenovus - Name Change - Cover Page - Terms and Conditions - 2022.pdf (1.2 MB)
S12X-006 - Request to Extend Groundwater Flow Testing on MW-09 - Jun 11_13.pdf (180.91 KB)
S12X-006 - Land Use Permit - Dec 5_12.pdf (1.5 MB)
Application and Related Docs
Document Received/Sent Uploaded
S12X-006 - Husky Oil Operations Ltd. - Approval Letter - Request for Deferral of 2018 GW Sampling - Aug 24_18.pdf (778.64 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
S12X-006 - Security Deposit Confirmation - Jan 4_13.pdf (61.86 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S12X-006 - Cenovus - Name Change - Request - Feb 21_22.pdf (919.57 KB)
S12X-006 - Update to MSDS of Chemicals Onsite - Feb 22_13.pdf (258.88 KB)
S12X-006 - Update to MSDS of Chemicals Onsite - Jan 17_13.pdf (431.92 KB)
S12X-006 - Application Update - Staff Report 1 - Dec 5_12.pdf (71.14 KB)
S12X-006 - Application Deemed Complete - Oct 26_12.pdf (132.25 KB)
S12X-006 - Additional Information to Application - Oct 26_12.pdf (1.86 MB)
S12X-006 - Additional Information Required - Oct 24_12.pdf (41.62 KB)
S12X-006 - Introductory Letter - Oct 18_12.pdf (307.84 KB)
S12X-006 - Regional Map - Oct 18_12.pdf (372.04 KB)
S12X-006 - Land Use Permit - Oct 18_12.pdf (846.01 KB)
S12X-006 - Environmental Protection Plan - Oct 18_12.pdf (1.52 MB)
S12X-006 - Pre-Disturbance Assessment - Oct 18_12.pdf (15.78 MB)
S12X-006 - Public Consultation - Oct 18_12.pdf (4.05 MB)
S12X-006 - Equipment List - Oct 18_12.pdf (65.46 KB)
S12X-006 - Program Map - Oct 18_12.pdf (1.79 MB)
S12X-006 - Waste Management Plan - Oct 18_12.pdf (486.9 KB)
S12X-006 - Archaeologists Permit - Oct 18_12.pdf (20.47 MB)
S12X-006 - ERP and SCP - part 2 - Oct 18_12.pdf (26.05 MB)
S12X-006 - ERP and SCP - part 1 - Oct 18_12.pdf (4.22 MB)
S12X-006 - Land Use Permit Application - Oct 18_12.pdf (53.2 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
Cenovus - Name Change - Staff Report - 2022.pdf (331.8 KB)
S12X-006 - Followup from ENR to Response from Husky - Dec 12_12 (94.99 KB)
S12X-006 - Response from Husky to SRRB - Dec 3_12.pdf (746.79 KB)
S12X-006 - Response from Husky to ENR - Nov 28_12.pdf (195.02 KB)
S12X-006 - Response from Husky to the Tulita Renewable Resource Council - Nov 28_12.pdf (384.86 KB)
S12X-006 - Review Comments from EC - Nov 21_12.pdf (48.09 KB)
S12X-006 - Review Comments from SRRB - Nov 21_12.pdf (628.87 KB)
S12X-006 - Review Comments from the Deline Renewable Resources Council - Nov 21_12.pdf (338.54 KB)
S12X-006 - Review Comments from ENR - Nov 21_12.pdf (4.72 MB)
S12X-006 - Review Comments from the Tulita Renewable Resource Council - Nov 19_12.pdf (1.55 MB)
S12X-006 - Review Comments from DOT - Nov 15_12.pdf (29.13 KB)
S12X-006 - Review Comments from AANDC - Nov 14_12.pdf (241.78 KB)
S12X-006 - Review Comments from DFO - Nov 5_12.pdf (24.88 KB)
S12X-006 - Request for Comments - Oct 26_12.pdf (154.16 KB)
Preliminary Screening
Document Received/Sent Uploaded
S12X-006 - Preliminary Screening - Dec 5_12.pdf (117.19 KB)
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S12X-006 - Review Comment Table 2018-2019 AR - Dec 15_20.pdf (317.93 KB)
S12X-006 S13L1-005 - Annual Report 2019-2020 - Dec 14_20.pdf (25.54 MB)
S12X-006 - Annual Reports 2018-2019 - May 22_20.pdf (60.31 MB)
S12X-006 - Husky Oil Operations - Groundwater Investigation Program - 2014-2015 Annual Report - Sep 30_15.pdf (192.92 KB)
S12X-006 - Husky Oil Operations - Groundwater Investigation Program - 2013-2014 Annual Report - Oct 7_14.pdf (204.18 KB)
S12X-006 - 2013 Annual Report - Nov 01_13.pdf (33.14 MB)
S12X-006 - 2013 Annual Report - WL Supplement - Nov 01_13.pdf (13.14 MB)
S12X-006 - 2013 Annual Report - Mud Rotary Drilling Summary - Nov 01_13.pdf (6.94 MB)
S12X-006 - 2013 Annual Report - Shallow Investigation - Nov 01_13.pdf (6.44 MB)
Inspection Reports
Document Received/Sent Uploaded
S12X-006_Inspection_Report_June-6-2022.pdf (845.51 KB)
S12X-006 - Inspection Report - Jul 20_20.pdf (2.56 MB)
S12X-006 - Inspection Report - Aug 6_13.pdf (144.03 KB)
S12X-006 - Inspection Report - Feb 18_13.pdf (51.77 KB)
S12X-006 - Inspection Report - Jan10_13.pdf (2.05 MB)
Operations and Notifications
Document Received/Sent Uploaded
S12X-006 - Regulatory Weekly Update August 15-21_19.pdf (57.47 KB)
S12X-006 - Regulatory Weekly Update August 8-14_19.pdf (56.86 KB)
Progress Reports
Document Received/Sent Uploaded
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Report - Apr 30_15.pdf (1.05 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Tables - Apr 30_15.pdf (401.55 KB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Figures - Apr 30_15.pdf (17.07 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix A - Apr 30_15.pdf (144.56 KB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix B - Apr 30_15.pdf (7.66 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix C - Apr 30_15.pdf (15.88 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix D - Apr 30_15.pdf (6.23 MB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix E - Apr 30_15.pdf (243.48 KB)
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix F - Apr 30_15.pdf (5.71 MB)
S12X-006 - 2012 Slater River Surface Water Evaluation - Baseline Hydrological Assessment - May 13_13.pdf (27.27 MB)
S12X-006 - Laboratory Analyses from Water at MW-19B Location - Mar 18_13.pdf (1.4 MB)
S12X-006 - Laboratory Analyses from Water at MW-09A Location - Feb 25_13.pdf (736.36 KB)
S12X-006 - Laboratory Analyses from Water at MW-09 Location - 7am - Feb 2_13.pdf (74.66 KB)
S12X-006 - Laboratory Analyses from Water at MW-09 Location - 2pm - Feb 2_13.pdf (82.6 KB)
SNP Reports
Document Received/Sent Uploaded
S12X-006 - Disposal of Drilling Fluids and Solids to Quarry B - Lab Analysis - Mar 15_13.pdf (2.67 MB)
7. Monitoring Programs
Other Monitoring Program
Document Received/Sent Uploaded
S12X-006 - 2017 Targeted Surface Water Monitoring Report - Apr 8_ 20.pdf (28.31 MB)
S12X-006 - 2018 Targeted Surface Water Monitoring Report - Apr 8_ 20.pdf (39.9 MB)
S12X-006 - 2019 Targeted Surface Water Monitoring Report - Apr 8_ 20.pdf (18.01 MB)
S12X-006 - Husky Request for Approval of 2019 Targeted Surface Water Sampling - Update on GW Sampling - Aug 2_19.pdf (65.13 KB)
S12X-006 - SLWB Staff Response - 2019 Targeted Surface Water Monitoring - Aug 8_19.pdf (145.12 KB)
S12X-006 - Husky - Request for Deferral of 2018 GW Sampling - Aug 8_18.pdf (210.6 KB)
S12X-006 - Husky Oil Operations - 2016 SWQ_Assessment - Aug 16_17.pdf (11.88 MB)
S12X-006 - SLWB Approval Letter - 2017 SW Monitoring and Deferral of GW Monitoring Program - Aug 8_17.pdf (720.98 KB)
S12X-006 - Request for Deferral of 2017 Groundwater Sampling.pdf (182.38 KB)
S12X-006 - SLWB Approval Letter - 2016 SW Monitoring and Deferral of GW Monitoring Program - Sep 7_16.pdf (683.71 KB)
S12X-006 (Groundwater)_Request for Deferral of 2016 GW Sampling.pdf (168.31 KB)
S12X-006 - Husky Oil Operations - 2015 SWQ Assessment - Dec 18_15.pdf (1.33 MB)
S12X-006 - Husky Oil Operations - 2015 SWQ Assessment - Appendicies A-B - Dec 18_15.pdf (3.62 MB)
S12X-006 - Husky Oil Operations - 2015 SWQ Assessment - Appendicies C-F - Dec 18_15.pdf (8.54 MB)
S12X-006 - Husky Oil Operations - 2015 SWQ Assessment - Appendicies G-J - Dec 18_15.pdf (2.68 MB)
S12X-006 - Husky Oil Operations - 2015 SWQ Assessment - Appendix K - Dec 18_15.pdf (12.22 MB)
S12X-006 - SLWB Confirmatory Letter - Husky - Surface Water and Ground Water Monitoring Plan - Sep 29_15.pdf (2.84 MB)
S12X-006 - Husky SLWB SWQ Letter Response - Aug 17_15.pdf (3.45 MB)
S12X-006 - Husky - 2015 Groundwater and Surface Water Monitoring Program - SLWB Response - Jun 30_15.pdf (200.74 KB)
S12X-006 - Husky - 2015 Groundwater and Surface Water Monitoring Program - SLWB Response - Jun 2_15.pdf (571.37 KB)
S12X-006 - Husky - Request for Deferral of 2015 GWSW Monitoring Program - Apr 14_15.pdf (134.89 KB)
S12X-006 - Surface and Groundwater Monitoring Plan - Staff Report 3 - Re-consider Plan - May 16_13.pdf (119.21 KB)
S12X-006 - Surface and Groundwater Monitoring Plan Approval - May 16_13.pdf (34.43 KB)
S12X-006 - Husky Response to Review Comments from AANDC - Surface and Groundwater Monitoring Plan - Revision 2 - May 6_13.pdf (84.9 KB)
S12X-006 - Review Comments from AANDC - Surface and Groundwater Monitoring Plan - Revision 2 - May 2_13.pdf (106.93 KB)
S12X-006 - Surface and Groundwater Monitoring Plan - Revision 2 - April 22_13.pdf (2.85 MB)
S12X-006 - Surface and Groundwater Monitoring Plan - Staff Report 2 - April 19_13.pdf (130.65 KB)
S12X-006 - Husky Response to Review Comments from SRRB - Surface and Groundwater Monitoring Plan - Revised - Apr 16_13.pdf (40.78 KB)