Husky Oil Operations Ltd. - S12X-006

Type A Land Use Permit Application by Husky Oil Operations Ltd. for a Groundwater investigation program.  Husky will be drilling twenty shallow wells to a maximum depth of thirty metres or three metres into the top of the bedrock.  The information collected will be used to assess the baseline water quality in shallow surficial and deep bedrock aquifers and to assess potential bedrock aquifers as a source of water to support future operations in the area.

Click here to see map​

Documents

Displaying 1 - 14 of 14
Uploaded On or After
Uploaded On or Before
5. Reports and Studies
Progress Reports
Document Received/Sent Uploaded
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Report - Apr 30_15.pdf (1.05 MB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Tables - Apr 30_15.pdf (401.55 KB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Figures - Apr 30_15.pdf (17.07 MB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix A - Apr 30_15.pdf (144.56 KB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix B - Apr 30_15.pdf (7.66 MB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix C - Apr 30_15.pdf (15.88 MB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix D - Apr 30_15.pdf (6.23 MB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix E - Apr 30_15.pdf (243.48 KB) April 29, 2015 April 29, 2015
S12X-006 - 2014 EL494 Husky Slater River Hydrological Assessment - Appendix F - Apr 30_15.pdf (5.71 MB) April 29, 2015 April 29, 2015
S12X-006 - 2012 Slater River Surface Water Evaluation - Baseline Hydrological Assessment - May 13_13.pdf (27.27 MB) May 12, 2013 May 12, 2013
S12X-006 - Laboratory Analyses from Water at MW-19B Location - Mar 18_13.pdf (1.4 MB) March 17, 2013 March 17, 2013
S12X-006 - Laboratory Analyses from Water at MW-09A Location - Feb 25_13.pdf (736.36 KB) February 24, 2013 February 24, 2013
S12X-006 - Laboratory Analyses from Water at MW-09 Location - 7am - Feb 2_13.pdf (74.66 KB) February 1, 2013 February 1, 2013
S12X-006 - Laboratory Analyses from Water at MW-09 Location - 2pm - Feb 2_13.pdf (82.6 KB) February 1, 2013 February 1, 2013